Yes I export from the previous month end schedule and then export the current month end schedule I add the codes to the current month end schedule via VLOOKUP and then reimport the current month end excel sheet.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Delete in general is done by a delete flag (last column).
I just tried Exp --> Imp: It does work. but the records which I deleted were not touched in P6. So use the delete flag.
Is there any entry in the event log?. Maybe youll start the trace (under edit --> user preferences).
More and more I assume that your pc is the reason.
What happens if youll log into P6 from a different pc with your user?
I tried exporting file then deleting all activities execpt one the reimport file. But I get same problem
I dont know the real reason. but next steps for me would be:
1. Export an Excel file (6.1 doesnt know xml-format), modify e.g. an activity name and import it again.
2. If 1. works then export that specific format, if not continue with 3
3. Compare your Primavera user settings with those of a colleague where it works (currency)
4. Compare the settings of your pc with one of a colleague where it works: regional settings, ...
It has not worked for me - but others in my group have used this process successfully.
I can import a new project
I will check on virtual memeory
It seems that the wizzard didnt come to an end and the import didnt start. I assume some access rights are missing while creating a table.
I dont know this code and since I dont work for Primavera there is no chance for me to get further information. So lets approach step by step.
Did it ever work?
Can you create a new project in P6?
Sufficient of memory inclusive virtual memory?
*****************************************************
* EXCEPTION REPORT *
*****************************************************
Date: 27-Feb-09
Executable: PM.exe
Application: Primavera Project Management
Event Code: AVAA0-2005-1
Message:
Access violation at address 00C36F5F in module PM.exe.
Read of address 00000090
Context:
1: TfrmWizImport.RunImportWizard
2: TfrmMain.actHomeExecute
3: TfrmMain.actFileImportExecute
4: TfrmEPS.mnuOpenProjectClick
5: ConsoleUtil.GetExitCodeProcess
6: ConsoleUtil.CreateProcess
7:
8:
9:
10:
Detail:
Type: EAccessViolation
Object Type: TCUltraButton
Components
==========
ORI: ORI Win32 #
ORI/DB: PMDB,0601.0011.0001.0001
IMG: IMG Win32 #1000
System Info
===========
Username: rickg Hostname: DT54713
OS Version: Windows NT ver 5.1, build 2600, Service Pack 3 (Intel Pentium)
Did it ever work?
Can you publish the content of the three detailed windows that you can see under "more"?
It does not mod format. Others can import using the same process
I dont know VLOOKUP. check if it modifies any format.
Did it ever work?
Yes I export from the previous month end schedule and then export the current month end schedule I add the codes to the current month end schedule via VLOOKUP and then reimport the current month end excel sheet.
Did you first export to Excel, then import using the same structure?
XLS or xml (Excel 2007)?
Import from excel
Rick
This message is within a small window. If youll push "More" youll get more information and can copy it.
The size is not relevant. How do import?
Sorry, no answer, just questions.
Regards
Dieter