P5/6 WBS Import???
Forum Sponsor
Top Posters
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
It has been a very difficult transition for our team from P3 to P5 (soon to P6). Some of the "advances" that are being touted for P6, I have yet to see working in our environment. The concept of construction guys entering their progress and their own activities into the master schedule may sound good, but has anyone checked with the construction guys???
Tony
Richard,
I spent a bit of time playing with the P3 tools to import the WBS (it is amazing how quickly one forgets P3!), but was hoping for a better solution (to avoid some truncation that will be necessary for P3s limits). I hadnt really considered MS Project, but that might be an acceptable method.
Im dumbfounded that importing the WBS is such an ordeal - one would think that Primavera could have anticipated that request!
Thanks a lot!
Tony