Not sure if it was a feature in 2k2, but in 2k3 you can export the outline from MS Project into Visio using a WBS Chart Wizard.
If the current master schedule was constructed using sound planning principles, then the outline should map directly to your WBS. This is because each heading and sub-heading will be associated with a WBS element.
Differentiating between tasks and WBS elements in MS Project should be a fairly straightforward exercise if the schedule is resource loaded. As a rule of thumb the schedule tasks will have resource assignments against them, the WBS elements won’t.
If the schedule isn’t resource loaded then hopefully the descriptions in the Name field will help you determine if they are WBS elements or tasks. As an example, ‘Pour Concrete’ lends itself to being a task description whereas ‘Foundations’ could be a WBS element.
The WBS should also be focused on the scope of project delivery rather than detailing the tasks the have to be completed to produce each deliverable.
what MS Project names WBS has nothing to do with P3 or PM5/6 WBS, it is rather a hierarchical numbering of the tasks
basically, you create the MS WBS by indenting subordinate tasks below the summary tasksn not by entering a code like in P3
MS Project gives a hierarchical number to the tasks, that you can display in Tools, Options, View, Display the ... at the bottom left of the dialog box
It is also possible to customize the WBS in Project, "Mode Plan" (I am using the french release of MSP, I dont remember the real name in english), then you will create a WBS coding about the same way that you know in P3; the difference is: the codes will be applied automatically to the tasks, you don not have to do it manually like in P3.
if the plan has headings and sub-headings and you can roll them up and expand various levels etc, then that arrangement of headings, sub-headings and Tasks is the WBS.
Also, the WBS field shows the same hierachy experessed in numbers, eg 1.1.1 etc.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Hi Emmanuel
Not sure if it was a feature in 2k2, but in 2k3 you can export the outline from MS Project into Visio using a WBS Chart Wizard.
If the current master schedule was constructed using sound planning principles, then the outline should map directly to your WBS. This is because each heading and sub-heading will be associated with a WBS element.
Differentiating between tasks and WBS elements in MS Project should be a fairly straightforward exercise if the schedule is resource loaded. As a rule of thumb the schedule tasks will have resource assignments against them, the WBS elements won’t.
If the schedule isn’t resource loaded then hopefully the descriptions in the Name field will help you determine if they are WBS elements or tasks. As an example, ‘Pour Concrete’ lends itself to being a task description whereas ‘Foundations’ could be a WBS element.
The WBS should also be focused on the scope of project delivery rather than detailing the tasks the have to be completed to produce each deliverable.
Regards,
Darren
EV,
what MS Project names WBS has nothing to do with P3 or PM5/6 WBS, it is rather a hierarchical numbering of the tasks
basically, you create the MS WBS by indenting subordinate tasks below the summary tasksn not by entering a code like in P3
MS Project gives a hierarchical number to the tasks, that you can display in Tools, Options, View, Display the ... at the bottom left of the dialog box
It is also possible to customize the WBS in Project, "Mode Plan" (I am using the french release of MSP, I dont remember the real name in english), then you will create a WBS coding about the same way that you know in P3; the difference is: the codes will be applied automatically to the tasks, you don not have to do it manually like in P3.
Good luck,
Alexandre
Not sure I understand your question.
if the plan has headings and sub-headings and you can roll them up and expand various levels etc, then that arrangement of headings, sub-headings and Tasks is the WBS.
Also, the WBS field shows the same hierachy experessed in numbers, eg 1.1.1 etc.
Hi EV
Easyest way is insert a colum from the drop down list and find WBS on the list this should give you a good starting
place
Steve