Need help on EPS and WBS

N
Nestor Principe 👤 Member for 17 years 7 months

Hi Samer,



Enterprise Project Structure.



Hi Dieter,



Actually, every report period I need to produce s-curve for every cost code or group of codes comparing the plan, earned value and actual expenditures. In P3 I can assigned several cost code per activity and then use tabular report to get earned value for the each cost code and/or group of codes. The s-curves are plotted using excel.



Say, there’s 1 cost code each for formwork, rebar and concrete. In P3, I can have the 3 cost codes assigned to a single activity (e.g. construct base slab).



Now in P6, it seems to me that I need to have 1 cost code per activity which will make the programme bigger. What I see is the EPS and WBS in P6 would have a lot to do to make the exercise simplier.



Am doing trials and samples to fully understand how the P6 works. By then I can ask question with more clarity.



My difficulty is more on organizing to ensure things work during construction stage rather than utilization of P6.



Thanks + regards + cheers..

Nestor




D
Dieter Wambach 👤 Member for 19 years 5 months

Nestor



Sorry, I didn’t understand your question. But If you’ll explain how you do it in P3, maybe it will be easy to "translate" it into P6.



Regards

Dieter

R
R. Catalan 👤 Member for 20 years 10 months

Dear Nestor,



You can do same basic principles in P3 in tracking your costs in P6.



If it’s a bigger project, you can utilize EPS to breakdown your project structure to smaller projects or subprojects to track your costs, but you will have separate projects to update.



Use group and sort by WBS if you want to categorize your costs by hierarchy of work in the project.



Cost accounts are also hierarchical in nature. You can create and assign more than one resource and cost account to an activity.



P6 HELP - Expenses are nonresource costs associated with a project and assigned to a project’s activities. They are typically one-time expenditures for nonreusable items. Examples of expenses include materials, facilities, travel, overhead, and training.



Best regards,

R. Catalan


N
Nestor Principe 👤 Member for 17 years 7 months

Thanks Dieter,



I will follow up after conclusion of my trial exercise.



Cheers+regards,

Nestor

D
Dieter Wambach 👤 Member for 19 years 5 months

Dear Nestor



Basically you can do the same in P6.



Costs in P3 --> Expenses in P6

Cost account in P3 --> Cost account in P6 (Enterprise --> cost accounts; are hierarchical in P6 + description)

Cost category in P3 --> Expense category in P6 (Admin --> Admin Cat’s --> Expense Cat’s)



To each expense you can assign an account and a category. Report group: "Project Expenses", mark "Time distributed data" --> group by expense category or cost account or both --> export to EXCEL



Curves are not possible for expenses. (Then you’ll have to use cost resources as in P3)



Regards

Dieter

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts