Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Thanks all
Actually WMF image was inserted in Header..
I deleted that now its working..
Arun
Install a printer driver for a large format printer if you dont already have one, say HP1050C.
You dont need the actual printer, just the driver.
Or print to PDF.
Then you can print to ISO A0 sheet which is big enough for anything.
Then you will see how many columns you are trying to print.
Also, in the Gantt Chart View zoom out.
Arun,
Can you install another printer driver on your PC and try it?
Or try to print another project, try with a dummy 2 task projects
Your problem could arise from some error in your project file
Hope it helps
Alexandre
Dear Trevor
I tried but not working.
Still the same story.
Arun
First, make sure you have selected the correct printer if you have various printers to choose from.
Use File, Print then select the printer then click on preview.
Try using File, Page Setup before you try to File, Print Preview. Thats where you can fix it.
Check the View tab and make sure you have not told MSP to print too many columns.
Reduce the margins to small but not too small (1 cm).
Then Print Preview.
etc etc I think you know the rest.