AFTER SETTING YOUR TEMPLATES EARLY AND LATE CURVES FOR YOUR SCHEDULE AND THE BASELINE SHALL BE JUST A FEW CLICKS AWAY.
http://www.youtube.com/watch?v=WkWizInifAU
Hi Arnold
Will you please send it to me too on [email protected].
It would be highly appreciated!
Thank you very much and have a great weekend.
M.Love
Already sent.
Already sent.
Hi Arlond,
Would u plz send it to [email protected]
Hi Sajid,
Already sent.
Hi Arnold
Will you please send it to me too on [email protected]?
I will be really grateful.
Thanks & Regards
Hi Wilson
Already sent.
Hi Arnold,
Pls send me the info to [email protected].
Many thanks.
You can use the Resourge Usage Profile, Resource Usage Spreadsheet --> spreadsheet option --> Calculate Average.
Hi Mamerto,
What type of Resources? Labor or Nonlabor? If you are talking about Manhours, this is Labor. If your Resources loaded in days, just multipy it by 8 hrs or 10 hrs per day depending on your calendars assignment.
Mamerto, I can do it for you. Pls. send me your .xer file to [email protected]
Arnold
hi try global change or excel import, multiply by 8.5 to 10 hrs per day
Hi Arnold tnx again got the guide in producing S-curve. as you know im new in P5 i just came because the guy who used to prepared the programme resigned so i have to assume. my other problem is the resources is loaded in days calculstion now the new Planning engr of Consultant is asking me to prepare the weight % in manhours. whats the fastest way to do it? in P5? i cant imagine 9K+ activities to be loaded in manhors.
Salamat...
Guys,
Already sent.
Hi Arnold think this is my second request I really dont know how to prepare S-curve in P5 please can you help me.. my email is [email protected]
Arnold,
Could not find it.
Please could you send it [email protected] or [email protected]
I do appreciate.
Regards,
Keme
Hi,
I sent it already.
HTH.
Arnold
Arnold please can you send it to my email too.
it is [email protected]
Thanks in advance
Hi Christopher,
Send me your email address and Ill show how to do it. I will send to your e-mail the snapshot in P6.
HTH.
Arnold
dont know how to produce on p5
A silly question I know but I can’t figure out how to produce an S Curve in P6 - I know how to in P3 but can’t figure it out in P6 - help please.......
Dear All,
The S-Curves are prepared based upon manhours.
In primavera P3, Go to Tools, then Tabular Reports, then Resources, then Loading.
Click on Loading. Click on add (it will open one box).
Then Go to Modify Tab and select your resources.
Then in Format Tab select Export report in CSV format and browse the location where u want the file to be saved.
Then in the same tab you can select the activity code.
Then in the Timescale tab you can select the data range (ie..the range of dates u want the s-curves values)
Then in the same in the display box u can select the typr ie wekkly ,monthly (If u select weekly it will display the values in week).
Then click OK and RUN.
It will display the excel file (If the file is not displayed at that time go to the specified location which u have given and open it)
Dear Mr mohammed,
can u plz forward the same to me also at [email protected].
Thanking u in advance
Regards,
Hello Mohammed,
I will be very grateful if you can send me detailed information about s-curve. My email address is [email protected].
I will be very grateful if you can help me.
Regards.
Keme
Dear Moutassem ,
The S-Curves are the curves which represents the planned progress and actual progress. The values can be derived from the primavera itself. If you need the detail information send me a reply to [email protected].
I will send it ...Inshallah