I don’t think there is a way to stop MS Project grouping alphanumerically. Many, if not all, Microsoft applications sort from A-Z or Z-A, try creating folders in Windows Explorer and Outlook and you’ll get the same result.
It is exactly for this reason you need ‘persuade’ MS Project to group as you require, by including an alphanumeric prefix for January / February / March / etc.
I tested your problem using four rows (1 / 2 / 3 / 4) and four values (a Jan / b Feb / c Mar / d Apr). I didn’t use a description. I also ticked the same check boxes you described in Post #1. This method grouped as follows:
a Jan
b Feb
c Mar
d Apr
Without the prefixes MS Project grouped alphabetically.
All I can suggest is if you are already using a prefix and when you group it still doesn’t display the values in the order you require, try recreating the Value list criteria in a spare text field.
Again if it doesn’t group correctly, try creating a new file to use as a test file and inserting four tasks. Use the same Value List criteria and see if you have the same problem. If you don’t, it may be a problem with the original file. If you do, it may be a problem with MS Project itself.
Thanks anyway, but i think this is one of the bugs of MSP2003.. by the way i also tried MSP 2007 before but i shifted back to MSP2003 coz of so many bugs in 2007 especially in grouping & outline codes...
Thanks for your reply, im using MSP2003. Still, it doesnt work on me. It shows me the grouping alphabetically & not the way ive arranged them by row.
It groups like this;
April
February
March
January
I wanted to group them as below;
January
February
March
April
I may be skipping some steps. I tried to fix it but unfortunately failed to do so. Can u give me some advice.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Ronaldo,
I think that ‘By row number’ only applies to how they are displayed in the drop-down list, not when then are grouped.
You can define group intervals in the ‘Customize Group By’ dialog box, but even that functionality is extremely limited.
I don’t see any other way apart from prefixing I’m afraid.
Regards,
Darren
Darren,
This only proves that choosing "By row number" under "Display order..." does not work for the purpose.
Thanks anyway, ive been using this for quite some time, I thought theres a way to resolve this without using prefix.
Thanks,
Ronaldo
Ronaldo,
I don’t think there is a way to stop MS Project grouping alphanumerically. Many, if not all, Microsoft applications sort from A-Z or Z-A, try creating folders in Windows Explorer and Outlook and you’ll get the same result.
It is exactly for this reason you need ‘persuade’ MS Project to group as you require, by including an alphanumeric prefix for January / February / March / etc.
I tested your problem using four rows (1 / 2 / 3 / 4) and four values (a Jan / b Feb / c Mar / d Apr). I didn’t use a description. I also ticked the same check boxes you described in Post #1. This method grouped as follows:
a Jan
b Feb
c Mar
d Apr
Without the prefixes MS Project grouped alphabetically.
All I can suggest is if you are already using a prefix and when you group it still doesn’t display the values in the order you require, try recreating the Value list criteria in a spare text field.
Again if it doesn’t group correctly, try creating a new file to use as a test file and inserting four tasks. Use the same Value List criteria and see if you have the same problem. If you don’t, it may be a problem with the original file. If you do, it may be a problem with MS Project itself.
Regards,
Darren
Hi Darren,
If u input those data, it is alphabetically arrrnaged, try to input them as follows;
January
February
March
April
please try to remove Months 1/2/3/4 from the field Value...
Regards
Hi Ronaldo,
I use MS Project 2k3 SP2 and Alexandre’s suggestion worked fine for me. I also tried these values:
Month 1: Jan
Month 2: Feb
Month 3: Mar
Month 4: Apr
They worked as well.
Have you tried this out on any other project files and are getting the same results, or is it just the one project you’re having this problem with?
Regards,
Darren
Alexandre,
Same here...
Ronaldo
Ronaldo,
I am working on MSP 2003 Pro SP1
Alexandre
Thanks anyway, but i think this is one of the bugs of MSP2003.. by the way i also tried MSP 2007 before but i shifted back to MSP2003 coz of so many bugs in 2007 especially in grouping & outline codes...
more power in planning...
Oh, damned!
my precedent post should read
Value: 1, 2, 3, 4
Description: "a January", "b February", aso
Alexandre
Alexandre,
From the "Value list for..." (Customize Fields of Text1),
I created the ff.:
Row: 1,2,3,4
Value:a,b,c,d
Description:January, February, March,April
...respectively
no check "For use a value from..."
...i checked "Allow addtl..." & "Append.." and
checked "By row number" under "Display order for dropdown list"
Still , I didnt get the order that i wanted.
regards
Ronaldo,
I did this way
Custom field = Text1 (Task)
List of values, no default value, user cannot enter his own values
Code Description
1 a January
2 b February
3 c March
4 d April
I added Text1 to some task table, then:
When I select one value in the drop down list, I can only see the codes
When I build a group on Text1, my taks are correctly sorted, starting with January, ending with April (in my test)
All the best
Alexandre
Alexandre,
Thanks for your reply, im using MSP2003. Still, it doesnt work on me. It shows me the grouping alphabetically & not the way ive arranged them by row.
It groups like this;
April
February
March
January
I wanted to group them as below;
January
February
March
April
I may be skipping some steps. I tried to fix it but unfortunately failed to do so. Can u give me some advice.
regards
Ronaldo,
it works well with MS Project 2003; are you using MS Project 2007 by the way? it is plenty of bugs, you should upgrade to SP1
Alexandre
In addition to my post... I want it to view in grouping like this;
January
Task 1
Task 2
February
Task 3
Task 4
March
Task 5
Task 6
April
Task 7
Task 8
but instead it shows me arranged alphabeltically...
April
Task 7
Task 8
February
Task 3
Task 4
March
Task 5
Task 6
January
Task 1
Task 2
I need your expert advice please...
regards