The ’Baseline Cost Report’ is a bar chart that allows you to easily compare the actual and planned costs, with the baseline costs of your project and communicate them to sponsors / boards / stakeholders etc as required.
It is a snapshot in time, that allows you to see how the project measures up financially with what you originally thought the project was going to cost (baseline / budget), the cost of the project as you currently see it (planned / scheduled) and how much it has cost to date (actual).
They are shown as seperate bars (I think you can also compare work as well) on a horizontal or vertical axis.
Obviously to make this work you need a fully resourced, up-to-date schedule in which you track your actuals (i.e. costs that have been incurred).
It is a Visual Report which is new feature in MS Project 2007.
From what I’ve seen, in 2k7 you have something called Visual Reports, of which the Baseline Cost Report is one. You can export to Excel 2007 or Visio 2007 and compare actual, planned and baseline work / costs.
I believe it’s in the form of a PivotChart / Table / Diagram so you can view the information in a variety of ways (project, phase, month, quarters etc.).
I’ve only seen a trial version as I don’t use 2k7 myself... mainly due to the multitude of bugs associated with the application.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Faisal,
The ’Baseline Cost Report’ is a bar chart that allows you to easily compare the actual and planned costs, with the baseline costs of your project and communicate them to sponsors / boards / stakeholders etc as required.
It is a snapshot in time, that allows you to see how the project measures up financially with what you originally thought the project was going to cost (baseline / budget), the cost of the project as you currently see it (planned / scheduled) and how much it has cost to date (actual).
They are shown as seperate bars (I think you can also compare work as well) on a horizontal or vertical axis.
Obviously to make this work you need a fully resourced, up-to-date schedule in which you track your actuals (i.e. costs that have been incurred).
It is a Visual Report which is new feature in MS Project 2007.
Regards,
Darren
thanks darren but ur reply is not clear i have asked what is the meaning of base line cost report
Hi Faisal,
Are you using MS Project 2007?
From what I’ve seen, in 2k7 you have something called Visual Reports, of which the Baseline Cost Report is one. You can export to Excel 2007 or Visio 2007 and compare actual, planned and baseline work / costs.
I believe it’s in the form of a PivotChart / Table / Diagram so you can view the information in a variety of ways (project, phase, month, quarters etc.).
I’ve only seen a trial version as I don’t use 2k7 myself... mainly due to the multitude of bugs associated with the application.
Regards,
Darren