you dont need to use WBS codes to create WBS in Spider Project though this package creates WBS codes for any structure if necessary. We always use multiple WBS structures to be able to analyze projects from the different points of view and to get necessary reports.
Usual structures: results, processes, responsibilities, cost accounts, contracts, geography, organizational, etc. Just switch to another (new) WBS, create phases, choose necessary activies, cut them and paste into corresponding phase. Nothing will change in other structures. And you can switch from one WBS to another by the mouse click in the menu Project/WBS.
We have a similar problem on our project as well - in the commercial sector. The WBS dictated by the client and used in the schedule to track effort costs through detail design RESULT CBS !
How are you proposing to handle the problem of highlighting the potential pitfalls?
Vladimir - What breakdown do you use for your different WBS codes? I know a few who have sucessfully used this approach in the past for offshore coding issues
why having several breakdowns in one project is considered as a problem. We always use several WBS - result WBS, process WBS, resposibility WBS, and others if necessary. It is a common practice.
I am also interested in an illustration or description of how to integrate the various breakdowns within a project. My client is having a difficult time accepting that their proposed "WBS" is actually a CBS and that, from a schedule management perspective, we will need to have two realted, yet different breakdowns. (This is a major US govt agency and I am surprised at their reaction)
This one I found in the net, I just modify a little and put the animation to better use for trainning.I have done a lot of others, on different topics. At the moment I have just sent You the other two.
I Received your slide and i found it very important and useful, i hope to receive the others, so i freed my mail box and i have another one: [email protected]
I searched in Googel But I did not find any free web site or books, so i will be very thankful if you help me in finding some information about this topic.
An integrated WBS/CBS/OBS is one of the requirement also to establish an EV management.
The intersection of this will give You the accounts.
Looking at them You can find out where the project is going bad or well, identify the reason and address all this to the right person.
The intersection of the three is giving a 3D model.
Or if taken two by two a matrix system.
I try to be as much as possible short as You can find a lot of good references around the net as well as good books on the issue. Just run a search on gogle.
Or send me Your email address and I can address You to some material more dedicate.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Dear Fellow planners,
Ive read the forum about WBS/CBS/OBS, i'm now currently doing waterpark project and i got into WBS for this project.
I would appreaciated if anyone has sample WBS for my references. my email is [email protected]
We can share knowledge if anything . Thanks
Regs,
Matt
Hai Mr. Luca Basile Can u send the slides for me also if u dont mind.
my E-mail Id: [email protected]
Cheers
Bala
Dear
Could u send the slides in "[email protected]", please...
Bye
Dear ALassam,
Your query is very important in the PM terminology.
In the our countries accounting DEPT is out of PM systems.
We must establish a system for integration between WBS & CBS by localised system.
I want help you for create this system. please contact me with email address [email protected]
B/R
Rashidi
David,
you dont need to use WBS codes to create WBS in Spider Project though this package creates WBS codes for any structure if necessary. We always use multiple WBS structures to be able to analyze projects from the different points of view and to get necessary reports.
Usual structures: results, processes, responsibilities, cost accounts, contracts, geography, organizational, etc. Just switch to another (new) WBS, create phases, choose necessary activies, cut them and paste into corresponding phase. Nothing will change in other structures. And you can switch from one WBS to another by the mouse click in the menu Project/WBS.
This feature is very useful.
Vladimir
Lori
We have a similar problem on our project as well - in the commercial sector. The WBS dictated by the client and used in the schedule to track effort costs through detail design RESULT CBS !
How are you proposing to handle the problem of highlighting the potential pitfalls?
Vladimir - What breakdown do you use for your different WBS codes? I know a few who have sucessfully used this approach in the past for offshore coding issues
Lori,
why having several breakdowns in one project is considered as a problem. We always use several WBS - result WBS, process WBS, resposibility WBS, and others if necessary. It is a common practice.
Basil,
I am also interested in an illustration or description of how to integrate the various breakdowns within a project. My client is having a difficult time accepting that their proposed "WBS" is actually a CBS and that, from a schedule management perspective, we will need to have two realted, yet different breakdowns. (This is a major US govt agency and I am surprised at their reaction)
lori pierce
[email protected]
For Mr. Dragos Daescu
Thanks a Lot for this web site but i know this site and it is very useful but do not have what i need exactly.
Sincerely Your
Dipl.Eng- ALassam Ghanem
For Mr. Emre Bayrak
This is an Artical Speaks about the Integration about CBS and WBS and OBS.
[William J. Rasdorf and Osama Y. abudayyeh, (1991) "Cost- and Schedule-Control Integration: Issues and Needs" ASCE, 117(3), 486-502].
i do not have an electronic copy, so you can find it in the Magazine of construction and engineering and management.
Sincerely Your
Dipl.Eng- ALassam Ghanem
Give a look at APEX project.
Is given with P3, in the same CD.
Is a pretty good example of integration Wbs/Cbs and Obs.
Hi
I also need some help on the issue you discussed.Can you also send me these slides or can you give any referance about 3D system you told ?
Thanks
Emre
[email protected]
You are welcome.
This one I found in the net, I just modify a little and put the animation to better use for trainning.I have done a lot of others, on different topics. At the moment I have just sent You the other two.
Luca
Thanks a lot Dear Sir
I Received your slide and i found it very important and useful, i hope to receive the others, so i freed my mail box and i have another one: [email protected]
Sincerely Your
Dipl.Eng- ALassam Ghanem
I sent You an email with a slide.
I try to send other 2 slides, but You email box was full.
When You will free it,let me know and I will send the other two.
E-mail: [email protected]
send me Your email and I will forward some materials.
Luca
Dear Sir Thanks for your reply.
I searched in Googel But I did not find any free web site or books, so i will be very thankful if you help me in finding some information about this topic.
sincerely your
Dipl.Eng- ALassam Ghanem
E-mail: [email protected]
An integrated WBS/CBS/OBS is one of the requirement also to establish an EV management.
The intersection of this will give You the accounts.
Looking at them You can find out where the project is going bad or well, identify the reason and address all this to the right person.
The intersection of the three is giving a 3D model.
Or if taken two by two a matrix system.
I try to be as much as possible short as You can find a lot of good references around the net as well as good books on the issue. Just run a search on gogle.
Or send me Your email address and I can address You to some material more dedicate.