Import form MSP 2007 to Primavera 6.1

S
Shahzad Sikandar 👤 Member for 20 years 4 months

Cherie



doesnt metter, even you save it in version 2003 (MSP), IT Atually uses the software system currently installed on your machine (in this case its MSP 2007).



you have to have MSP 2000, 2002/3 in order to import a MS project files into Primavera 5 or 6



but i am still looking for solutions.

cheers

C
Cherie S Blare 👤 Member for 20 years 5 months

Why not save in MSP 2003 ( as you can in MSP 2007 ) and then import / open up in P6 ? I think this can only be done in standalone P6 - not intranet licence based.



Regards



Cherie

P
Paul Harris 👤 Member for 25 years 2 months

The installation of MSP 2007 disables the import feature of P6.



Unloading MSP 2007 may resolve your problem.



Paul E Harris

Eastwood Harris Pty Ltd, Melbourne, Australia

Planning and Scheduling Training Manual & Book Publishers, Consulting and Training

www.eh.com.au

Forum Sponsor

Top Posters

AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts