P5 to P3 Converstion

B
Brian Beck 👤 Member for 18 years 10 months
M
Mohamed Edris 👤 Member for 19 years 11 months

Hi all,



Whenever i am exporting a schedule from P3 to P5 , i got negative float in P5 however there was no negative float in P3 for the same schedule.



Pls advise.



Thanks

Mohd

N
noha attya 👤 Member for 19 years

hi all planners

the site for downloading the P5 manual is not working or damaged

if any one know another like

please advise

B
Brian Beck 👤 Member for 18 years 10 months

I got it fixed.



Has to do with un-checking the Primary Resourse box on each item under the Resources tab on the Activity View.



Did a global change to effect all activities.

D
Dieter Wambach 👤 Member for 19 years 5 months

Brian

Negative lag is on the relationships. Which kinds of relationships are involved? How was the lag before?

If the float becomes negative you can check the calendars.

Cheers

Dieter

Forum Sponsor

Top Posters

James Williams
74 posts
Abkar Bannayan
25 posts
christiandt
0 posts
J Vaartjes
3 posts
Aidar Kurmantayev
0 posts
Noe Radovan
8 posts
GeoVe
0 posts
Johannes Vandenberg
14 posts
Soheil Barekat
4 posts
Peter Holroyd
51 posts