R
Ronald Winter 👤 Member for 23 years 5 months

Longest Path is a process, similar to but different from CPM and total float. Longest path is a better measurement of the critical path than using total float, as tracking total float ‘fails’ in instances where multiple activity calendars, LOE, interruptible activities, resource leveling, constraints, and out-of-sequence activities are used. I have an article published on the web about this and enhancements to longest path at http://ronwinterconsulting.com/published.htm. Good luck!

D
Dieter Wambach 👤 Member for 19 years 5 months

Hi Jiayin

The reason is a very simple one:

Primavera does calculate with decimals. If you’ll change your preferences that decimals will be displayed, you’ll realize that those activities you are missing have a float of 0. which is greater than zero.

Edit --> User Preferences --> Time units --> ’Show decimals

Regards

Dieter

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts