Hi Ismail,
We used slipform in construction of silos in the project that Im currently working in.
Generally, you can operate the slipform 24/7 but you must have enough steel fixers, general labor, concrete finisher, rc concrete, etc..
You should also consider duration for assembly of the slipform.
Karim
Hi Ismail,
Pick up the phone and ask Sonia of JBR1 or Tara of JBR3 or
Riswan of DIFC Gate Village or
You can also check with Arabtec their whereabouts
Call BRM.
I agree with Vishwas,
There is a limitation on how high Core Wall will go up.
Cheers,
Charlie
Ismail,
Normally in the UAE (for lift cores), it is 3 mts per day. You wouldnt get an approval from the consultant for anything more than that.
But, then, slipforms have to be coordinated with crane height - which in turn has to be synchronous with the slabs.
Ultimately, the corewall casting depends on the slab-to-slab cycle.
Happy Planning!