Hello,



My understanding is in this forum, Planning means scheduling (time management)



the things you listed in 1) are not the main responsibity of a scheduler, althought some time scheduler can do these things. Scheduler will work close with designer/site engineer..... to develope the schedule. Planner is not the one to make decisions for these things,but can give valuabe suggestion/analysis to support the decision maker.



what information are required vary greatly depend on the stage of the project ( conceptual design, detail design, bidding, awarded...),and what side you are working for (client, contractor, consultant...). Sometime I did schedules with only a piece of layout drawing, sometime dozens of detail construction drawing. Most of the time just try to find whatever you can find to make the schedule as realistic as possible.


Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts