WBS+RBS

R
Rafael Davila 👤 Member for 22 years 3 months

divakar



If you are into highways planning you should look at Spider Project Linear Diagram, the preferred method to display schedules in highway jobs. Spider Project is the only true CPM software that supports this kind of report while maintaining CPM logic. Other linear Diagram Software are not as good and most do not support resource leveling.



Best regards,

Rafael

V
Vladimir Liberzon 👤 Member for 25 years 4 months

What do you mean by loading RBS to WBS?

RBS is Resource Breakdown Structure and groups resources and WBS groups activities.



Do you mean to prepare these strucutures in the concrete software? Then specify the package that you use.



Best Regards,

Vladimir

A
Anoon Iimos 👤 Member for 19 years 8 months

it is supposed to, however most programs (from what I know) don’t have RBS

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts