In fact, this item used in the high technlogy industries. but we use this methodology in PM.
The Virtual Socket Interface Alliance (VSIA) is an open, international organization that includes representatives from all segments of the system-on-chip industry: System houses, Semiconductor vendors, Electronic Design Automation (EDA) companies, and Intellectual Property (IP) providers. VSIAs vision is to dramatically accelerate system-chip development by specifying open standards that facilitate the mix and match of virtual components from multiple sources. VSIA has wide industry participation with more than 180 member companies from Asia, Europe, and the US. Membership is open to any corporation with an interest in the development and promotion of open standards used in the design of system-on-chip.
Knowledge sharing is a process. There are lot of method, tools, etc. The forum providing a platform and IT is enabler on sharing. I think we need to think about those available information is knowledge or not.
For examplem, production rate database. "Data" are informative to planner. Can it be a guide line for programme preparation, I dont think so. If I search a production rate, I would like to know how to work it out, what resource, what environment condition, what $ be send. An integration and analysis, more like knowledge
BTW, planning planet already providing a chance among us for discussion, colebaration and information sharing. Thanks.
Knowledge sharing is very good suggestion, I have the same probelm, as he stated it, but my expericance says Risk and calture is a importance element for each project , we usually do not consider this factor in our estimation.
Folks, please keep posts on topic. This thread was started as a suggestion thread for new forum topics. Please do not spam the forums with advertisements for other web sites. There is a links page for other resources. Please suggest your favorite sites for a listing there.
You are asking if people know new discussion categories. Well I know 1 new category.
Risk analyses.
The first question.
1. When do you use risk analyses on a project.
2. On which planning do you perform a risk analyses? Which level of planning?
3. What is the most used risk analyses on project planning and which risk analyses tool is the most used and why?
This not a question or subject to discuss this is just note from my Experience in the construction industry the productivity rates is the main problem when making schedule the productivity changed from time to time from place to place from Productivity Rate. This not a question or subject to discuss this is just note from my Experience in the construction industry the productivity rates is the main problem when making schedule the productivity changed from time to time from place to place from floor to floor. So assign resource and duration is the most difficult things in planning stage. This make the construction planning one of most difficult work in the world, but this our choice.
Thank you to give me chance to write the first subject in this forum.
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
jj
how can we measure the percent complete use in EVA
how can we forecast the completion date bases upon the performance of project(EVM)
Hello Edgar,
Use Microsoft Project (any version).
Cheers
Charlie
Khalid Abdelaal,
Im with you. Please advise further on how can you make planning easier & faster.
Regards,
Edgar
Also E-knowledge is technologically realized by the fusion
of e-learning and knowledge management and through
the networking of knowledge workers.
Thamks mehdi
I just wanna to ask you about training this VSI, There is any refrence for study, if there is can you send it me.
Dear morteza,
In fact, this item used in the high technlogy industries. but we use this methodology in PM.
The Virtual Socket Interface Alliance (VSIA) is an open, international organization that includes representatives from all segments of the system-on-chip industry: System houses, Semiconductor vendors, Electronic Design Automation (EDA) companies, and Intellectual Property (IP) providers. VSIAs vision is to dramatically accelerate system-chip development by specifying open standards that facilitate the mix and match of virtual components from multiple sources. VSIA has wide industry participation with more than 180 member companies from Asia, Europe, and the US. Membership is open to any corporation with an interest in the development and promotion of open standards used in the design of system-on-chip.
Best Regards
Knowledge sharing is a process. There are lot of method, tools, etc. The forum providing a platform and IT is enabler on sharing. I think we need to think about those available information is knowledge or not.
For examplem, production rate database. "Data" are informative to planner. Can it be a guide line for programme preparation, I dont think so. If I search a production rate, I would like to know how to work it out, what resource, what environment condition, what $ be send. An integration and analysis, more like knowledge
BTW, planning planet already providing a chance among us for discussion, colebaration and information sharing. Thanks.
Mehdi
Please tell us about VSI ( Virtual socket interface), what is that ?
Hi,
Knowledge sharing is power.
Are there ways for that? Do you know about VSI ( Virtual socket interface)
M.Rashidi
Knowledge sharing is very good suggestion, I have the same probelm, as he stated it, but my expericance says Risk and calture is a importance element for each project , we usually do not consider this factor in our estimation.
Folks, please keep posts on topic. This thread was started as a suggestion thread for new forum topics. Please do not spam the forums with advertisements for other web sites. There is a links page for other resources. Please suggest your favorite sites for a listing there.
Bernard Ertl
InterPlan Systems Inc. - Project Management Software, Project Planning Software
Dear all,
Maybe the sitr ( www.projectconnections.com)WILL HELP YOU.
Visit www.hpcconsult.co.uk - this may help with your questions.
Search Project Managers Procedural Guide.
Best Wishes
Mike Harvey
Dear Jake
Please visit hpcconsult.co.uk and view 'Planning Academy'.
After 40 years in the industry I am trying to give something back to those looking to resolve problems.
Regards
Mike Harvey
You are asking if people know new discussion categories. Well I know 1 new category.
Risk analyses.
The first question.
1. When do you use risk analyses on a project.
2. On which planning do you perform a risk analyses? Which level of planning?
3. What is the most used risk analyses on project planning and which risk analyses tool is the most used and why?
Productivity Rate
This not a question or subject to discuss this is just note from my Experience in the construction industry the productivity rates is the main problem when making schedule the productivity changed from time to time from place to place from Productivity Rate. This not a question or subject to discuss this is just note from my Experience in the construction industry the productivity rates is the main problem when making schedule the productivity changed from time to time from place to place from floor to floor. So assign resource and duration is the most difficult things in planning stage. This make the construction planning one of most difficult work in the world, but this our choice.
Thank you to give me chance to write the first subject in this forum.