Manhours per discipline
Forum Sponsor
Top Posters
Mohammed Netarwala
12 posts
Moahmed
0 posts
S Z
4 posts
Iftikhar Awan P.Eng.
19 posts
ahmad rashidi
4 posts
paulciszewski
0 posts
Catalin Suditu
11 posts
Laraib Fatima
0 posts
Adrian Fletcher
12 posts
GeoVe
0 posts
Usually we used reference from old project. Allocation manhours are depend on works category i.e Piping works (Shop or field), Structural Works (Fabrication or Installation)etc...
Rgds,
Berli
start with the estimator - at least you will align with the manhours in the bid
different country/area has different standard