"At the summary level, the Performance % complete is calculated as follows:



Performance % Complete = (BCWP * 100) / BAC



(Where the BCWP is the Budgeted Cost of Work Performed and the BAC is the Budget At Completion)



BCWP is calculated as Activity % Complete * Baseline Total Cost"



Cheers

Julie


M
Marcio Sampaio 👤 Member for 20 years 7 months

Heelo Julie,



Do u know why Costs assingned is a condition? Why not units only?



Regards.

J
Julie Scully 👤 Member for 20 years 7 months

Summarising the physical % complete is currently an enhancement request that Primavera are looking into. They have a workaround on the knowledgebase (bulletin # prim11292), but one of the conditions is having costs assigned to the activities.



HTH



Cheers

Julie

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts