Imran,
You have poised the right kind of query,
I was about to ask the same query, if the productivity rate for block work ( thermalite block is given x sq m)what does that mean?)
Is that the productivity of a mason with a helper?
Can you (moderator) explain this? Since generally productivity rate is given for a trade ( for e.g. a mason for block work can complete 100 sq m per day with a helper with him),
Can you give the rates based on the trades,
Thanks,
francis