You will also find that the timesheet approval screen in the client / server module will now allow for the selection of multiple reporting periods and graphically indicate when a time period contains timesheets awaiting approval.
I understand that the next release (v6) is targeting some positive developments including US 508 compliance, excel style editing capabilities, better grouping and sorting, the ability to search by project and the ability to even add and assign activities.
These were referenced at presentations made at the last User Conference in Orlando (Nov 05) and of course are all subject to change depending on the success of the R&D process.
Timesheets 5.0 (aka TeamPlayer)features are equivalent to Timesheets 4.1. However, it does have some technological enhancements -- support for newer technologies (browser versions and JRE) and simpler deployment through Java Web Start (JAWS).
TeamPlayer (Primavera Timesheet) has the same functionality at the timesheet and progress update level. However, from version 4.0 TeamPlayer users could be upgraded to Team Member which includes the standard Timesheet functionality with the workflow and collaboration..
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
You will also find that the timesheet approval screen in the client / server module will now allow for the selection of multiple reporting periods and graphically indicate when a time period contains timesheets awaiting approval.
I understand that the next release (v6) is targeting some positive developments including US 508 compliance, excel style editing capabilities, better grouping and sorting, the ability to search by project and the ability to even add and assign activities.
These were referenced at presentations made at the last User Conference in Orlando (Nov 05) and of course are all subject to change depending on the success of the R&D process.
Premnath,
Timesheets 5.0 (aka TeamPlayer)features are equivalent to Timesheets 4.1. However, it does have some technological enhancements -- support for newer technologies (browser versions and JRE) and simpler deployment through Java Web Start (JAWS).
Regards,
Bill
TeamPlayer (Primavera Timesheet) has the same functionality at the timesheet and progress update level. However, from version 4.0 TeamPlayer users could be upgraded to Team Member which includes the standard Timesheet functionality with the workflow and collaboration..
Hope this helps