Reports: Resource Loading Summary for a particular OBS

A
Amar Aghana 👤 Member for 20 years 10 months
A
Amar Aghana 👤 Member for 20 years 10 months

Gordon, I Checked with POINT. They informed this facility is not available in 4.1 but is available in 5.0. Thanks for participation by all.

G
Gordon Blair 👤 Member for 20 years 10 months

Amar,

Not sure, strictly speaking, if the programme is designed to do this. The people within the OBS can have their ’fingers in many pies’ across any number of projects.

While I agree it could be useful to be able to advise an individual when one of their resources is over-allocated, the software doesn’t appear to be set up to do this...

Am assuming that you’ve tried filtering for all activities where Resp Mgr = ...

Have you tried creating a UDF, and running it that way....?

D
David Kelly 👤 Member for 21 years 7 months

Wow. not often I’m beat. Can’t do this in the report wizard, Resource spreadsheet, tracking layouts, or the resource assignments view.




Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts