scheduling

updating and working plans to record progress and spend

Project Plannner, Dong Energy, Race Bank

START Date
END Date
Experience Hours (Planning & Scheduling)
2550

Responsible for developing and maintaining all schedules for the construction of the Onshore Substation(using Primavera P6 (v8.2)) and provide analyses on Resources, and Schedule forecast. Assist in Risk management and updating the Risk Register (Excel). Assess Contractor progress and produce a Progress Report. Ensure Planning standards are met by the Contractor. Creating and maintaining What-if scenarios and breakout programmes.

Senior Planning Engineer, Technip , Borkum West II, Westermost Rough, MEG-1

START Date
END Date
Experience Hours (Planning & Scheduling)
2400

Responsible for developing, maintaining and updating all schedules for different projects, in different phases from tendering to close-out (using Primavera P6 (v7) and MS Project 2010) and provide analyses on Resources, Risk, and Schedule. Report progress to both the Client and internally. Responsible for developing the planning and reporting procedures and provide training for more junior personnel.

Project Manager, Prenecon , Commercial, Residential and Industrial Buildings

START Date
END Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
4000

Project Manager and Construction Manager in Residential and Commercial Buildings Industry, Renewable Energy, Oil&Gas and Infrastructure.

Duties covering the full project cycle from scope definition and contractual agreement through to stakeholder, supplier, resource, quality and cost management to ensure handover on time (using Ms Project 2003 and Primavera P5) and within budget.

SENIOR PLANNER, Adyard Abu Dhabi, Multiple Refinery Capital and Maintenence Projects

START Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
8800
Ø  Identification of job volume, criticalness, material requirements, rigging requirement & Pre-T/A arrangement through site visit and scope studies.

SENIOR PLANNER, Adyard Abu Dhabi, Multiple Refinery Capital and Maintenence Projects

START Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
8800
Ø  Identification of job volume, criticalness, material requirements, rigging requirement & Pre-T/A arrangement through site visit and scope studies.

Project Controls Manager, Orascom Construction, Abu-Rawash Waster water Treatment Plant, Grand Heights Infrastructure & Villas Works, MARS Egypt site development

START Date
Experience Hours (Planning & Scheduling)
32150
Experience Hours (Cost Management)
15350
Experience Hours (Forensic Analysis)
11900

Project Controls Manager:

 

1.      Head, lead and manage a team of project controls and planners worked on site.

2.      Reporting directly to Managing director, unit’s director and project controls director.

3.      Assess, hire project controls and set the staff schedule.

PLANNING ENGINEER, Gulf Contracting Co WLL, Doha Festival City & Le Mirage Downtown

START Date
END Date
Experience Hours (Planning & Scheduling)
5500
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
500

Project: Le Mirage Downtown (4B+G+M+10+Tech+PH) Mixed Use Building (Contract value: Qar 190 Million

Location: Doha, Qatar)Preparation of resource and cost loaded fidic clause 14 baseline schedule and getting it approved from client.

Updating the programme as per the progress at site, preparation of recovery schedules.

Preparation of Extension of time Claim by Time impact analysis.

critical path analysis of schedule at progress reporting. Various reports – DPR, WPR, MPR (preparation and

tracking).

Principal Project Services, BHP Billiton, Escondida Mass Mining Method (MMM)

H
Henry Leon 👤 Member for 18 years 7 months
START Date
END Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
500

Provide project services support (estimation, budget control scheduling and planning) for theprojects such as Mass Mining Method (MMM), Escondida Water Recovery and TailingManagement (EWRTM), EWR (Escondida Water recovery demo plant) and other as IPR memberfor review the governance accomplish for estimation and scheduling

Estimator and project controls engineer, KTI - Technip, Multiple Projects / Petrochemical ; Oil and Gas / EPC Project Controls

START Date
END Date
Experience Hours (Planning & Scheduling)
8000
Experience Hours (Cost Management)
8000

Estimator and project controls engineer (cost and schedule) on petrochemical projects worldwide

Owner Pre-bid Project Schedules, Project Inspection, JVG Engineering, Ella Expansion, Kirkwood Bridge and Extension, N. MacGregor Storn Sewer Relief, Lyons Expansion and Hazardous Abatement

START Date
END Date
Experience Hours (Planning & Scheduling)
200
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
50

Contract Civil Inspector, Primavera Scheduling

§  Contract civil inspection for SJRA online WW treatment plant expansion tripling capacity

§  Primavera CPM scheduling for Houston PW&E for 5 ‘difficult’ projects

§  ‘Get Vic over there’ contract inspection at problem projects for Houston PW&E