Progress Reporting

Project Planner, N G Bailey & Co, Georges Dock Building, Liverpool

START Date
Experience Hours (Planning & Scheduling)
350

Georges Dock Building, Liverpool UK

The Georges Dock Building based in Liverpool UK was refurbishment project, converting unused office/storage space into a brand new, state of the art combined control room for Mersey Travel (Client) & Merseyside Police for the overseeing of the Mersey Tunnels.

The main use of the building itself is to supply fresh air, and extract fumes from the tunnels it is linked to however, it was the offices contained within the actual building that were being transformed. 

My ro

Project planner, Cimolai, Maintenance Hangar Doha Airport, Warsaw National Stadium

START Date

I worked as a planner in several international project in the last 8 years for a big structural steel fabrication and erection Italian company.

I've been working trought several project in Qatar, Poland, Italy, Panama working with Primavera P.3 and P.6 for scheduling and reports.

EPC Lead Planner, Foster Wheeler Asia Pacific, Carboxylate Project

START Date
Experience Hours (Planning & Scheduling)
2500
Experience Hours (Cost Management)
500

Lead Planner for the FEED and EP phase of the Carboxylate project that would expand the existing plant’s current production capacity. Utilized modularization concept on its process structures and pipe racks to maximize productivity and to shorten construction duration.

Project Controls Coordinator, ATCO, Various Projects Across Canada

B
Burak Gunes 👤 Member for 19 years 4 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
2000

ATCO Structures & Logistics is part of the ATCO Group of Companies. ATCO Structures & Logistics hasclients in over 100 countries, 45 sales offices around the world, manufacturing facilities in NorthAmerica and Australia, and operations on five continents.

Project Planning Engineer, AZMEEL CONSTRUCTION COMPANY, 2 Mosques, 8 Apartment Buildings, Construction of 408 Villas, Kindergarten, Site Development

START Date
END Date
Experience Hours (Planning & Scheduling)
6500
Experience Hours (Cost Management)
6500
Experience Hours (Forensic Analysis)
6500

·         Updating project schedule on a weekly basis.

·         Prepare tracking sheets for existing projects.

·         Prepare cash flow and cost curve of projects.

·         Collect raw data from site and converting it into technical analysis format generating statistical report.

Core senior Planner, TWP Projects, TWP various

B
Buks Beukes 👤 Member for 12 years 2 months
START Date
END Date
Experience Hours (Planning & Scheduling)
8500
Experience Hours (Cost Management)
8000
Experience Hours (Forensic Analysis)
4000

Responsible for compiling schedules for pre feas, feas, execution, assisting with CBE and procurement planning as well as monthly and quarterly cashflow detail planning. Progress reporting, production reporting and optimazation for earlier execfution. optimizing schedule to meet deadlines, schedule crimping.

Area Project Manager, Monterosa Construction, Concept Stores Shopping Mall, Lakepoint Towers, Nestle Mega-distribution Warehouse.

J
John Davis 👤 Member for 12 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
10000
Experience Hours (Cost Management)
20000
Experience Hours (Forensic Analysis)
10000

PROFESSIONAL PROFILE

A highly experienced and enthusiastic Site Manager with over thirty five years’ experience within the construction industry. A strongly driven and ambitious individual who is able to plan projects and manage subcontractors, delivering high quality building works on time and within budget. Even when working in a highly pressurised working environment, has the ability to perform effectively. Possesses excellent interpersonal skills and can communicate well at all times.

OBJECTIVE

Senior Project Control Engineer, Sacramento Regional Transit District, South Sacramento Phase 2 Light Rail Extension

START Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
500

South Sacramento Phase 2 Light Rail Extension Support ($270 million dollar project):

Cost Manager:

  • Producie Estimate at Completion Reports weekly sorted by Project Phase and Federal Transit Administration (FTA) required SCC Codes.
  • Produce Monthly Cost Reports that are provided to FTA Project Management Oversight Consultants.
  • Design and maintain Budget Change Database.
  • Produce detailed labor reports including trend analysis.
  • Produce Project and Contract Contingency Reports with T

Senior Project Control Engineer, Sacramento Regional Transit District, South Sacramento Phase 2 Light Rail Extension

START Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
500

South Sacramento Phase 2 Light Rail Extension Support ($270 million dollar project):

Cost Manager:

  • Producie Estimate at Completion Reports weekly sorted by Project Phase and Federal Transit Administration (FTA) required SCC Codes.
  • Produce Monthly Cost Reports that are provided to FTA Project Management Oversight Consultants.
  • Design and maintain Budget Change Database.
  • Produce detailed labor reports including trend analysis.
  • Produce Project and Contract Contingency Reports with T

Planning /Project Controller, Galfar Engg and Construction SAOG, Harweel Cluster Phase 2AB

START Date
END Date

Project Description:

Harweel Cluster Phase 2AB Project : consist of Processing plant and development of 5 oil fields containing 32 new wellheads, 8 existing wellheads, 5 Remote Gathering Manifold stations, 1 Remote Injection Manifold Station, GRE Flow lines from well heads to RGMS, CS Injection lines from RIMS,  CRA (Corrosion Resistant Alloy) Trunk Lines from RGMS/ RIMS and Harweel cluster Process Plant. Petrofac is the EPC Contractor and have main sub contactors Galfar and Tekfen