Worked as Project Planning Engineer (Project Control) with BACS (Bechtel, Almabani, CCC, Siemens) Consortium at Riyadh Metro Project KSA (Riyadh Metro – Line 1, 2) Client AR Riyadh Development Authority ADA with Consultant RMTC. (May-2018 to till Date)
This project ran straight on from the previous Farringdon Scheme moving from Laing O'Rourke to Bam Nutall for project continuity.
My role was as a Senior Planner reporting to a Lead Planner. I was responsible for the Planning, Timing & Sequencing of the construction of the new Eastern Ticket Hall (ETH). This was a heavy Civils project and included the following: