· Participated in the construction of 28km flexible pavement; cross drainage structures, major and minor bridges and railway over bridge with retaining walls
All the Projects Clients are in Iraq - BP, DNO, MOL. • Project Baseline Schedule preparation in Primavera 6.• Preparation of S Curve, Histograms, Budget, and Progress measuring system.• Updating of schedule on a weekly basis in Primavera 6.• Coordinating with the engineering crew to deliver the deliverables on time.• Keeping track of project on a daily basis.• Weekly and monthly reporting which includes cost reporting.• Bi weekly cost reporting.• Alerting the construction team of the ob
• Preparation of Planning Package as per agreed Schedule and WBS Structure.• S Curve Preparation.• Preparation of Effective Project Progress Monitoring System.• Weekly, Monthly and Daily Report Preparation for Client and Management.• Review of Project Progress with Project Construction Team so as to notify of any deviation and corrective actionpreparation.• Project Budget and Cash Flow Preparation.• Project Cost Control and Reporting.• Subcontractor Administrat
As Planning Engineer I was Responsible for all the Planning and Cost Control aspects of the Projects assigned. I was reporting to the Project Manager and regional Projects Control Manager.
As Planning Engineer I was Responsible for all the Planning and Cost Control aspects of the Projects assigned. I was reporting to the Contracts Manager. Main responsibilities covered under the role were preparation of cost and resource loaded master schedule, monitoring of actual work against approved schedule and issuing early warnings to relevant department on any deviation, preparation of earned values and comparison with the actual cost to measure the profitability of projects, Preparation of S-curves, monthly reports and preparation of EOT claims.
Member of a Project Control Team for a Construction Group and dealing with Roads & Bridges, Bulk Civil Works, Pipeline Works, Land Development etc.
Planning & monitoring the projects starting from Tendering stage till the finish stage. Dealing with weekly reporting and detailed productivity analysis to track the project. Early warnings for future conflicts or issues, Dealing with EOt Claims & associated Costs.
October 2012 – Present Tanjung Bin 4 Intake, Pump Station and Outfall Pipe, Johor, Malaysia
Management of planning and controls for the design, procurement & construction of cooling water intake, pump station and offshore discharge culverts for a 1000 MW coal fired power plant.