Earned Value Management

Planning Manager, Al HAMAD CONTRACTING COMPANY, 122 NOS VILLA AT MIRDIF, B+G+M+46F Al Batha Tower + G+9 Carpark Building @ Business Bay - Dubai, California Residence, Kingdom of Sheba - Balqis Residence

START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
2000

• Managing team of 8 Planning & Senior Planning Engineers to perform the

following tasks:

- Preparing and updating the project baseline / master program.

- Preparing weekly look ahead program as per the master program.

- Preparing weekly and monthly progress reports.

- Preparing Earned value & KPI reports.

- Preparing recovery programs.

- Preparing productivity reports.

- Preparing progress S-curve (Time wise/Man-hours) and manpower histograms.

- Preparing of commodity charts and tracking with actual for close monitoring.

EPC Project Lead, ABB INC., Kizomba C, SNEPCO BONGA

START Date
END Date
Experience Hours (Planning & Scheduling)
14900
Experience Hours (Cost Management)
14000

·       Lead a team of 5 planners, inclusive of subcontractors, and 3 cost engineers.

·       Maintained Integrated Master Project Schedule for the Exxon Kizomba C Project – Topsides and Subsea Systems.  Collaborated with subcontractors for schedule updates and status.

·       Established Work Breakdown Structure and Cost Breakdown Structure for both Scheduling and Cost Reporting.

Senior Project Controls Manager, Stantec Consulting Ltd. , Potash Underground and head Frame Expansion

START Date
Experience Hours (Planning & Scheduling)
600
Experience Hours (Cost Management)
7200
Experience Hours (Forensic Analysis)
10000

(Potash Corporation of Saskatchewan, Vale Canada, BHPB Billiton, KGHM Victoria, Mosaic Potash, Cayeli Bakir Isletmelari A.S., Red Lake Goldcorp Inc., Glencore Canada Corp.,Lake Shore Gold Corp.)
This position is responsible for providing leadership and quality assurance to the project controls activities of the Stantec Mining Practice, the project controls team and client. This position performs a wide variety of project controls tasks, ranging from complex to routine, all of which contribute to efficient and professional operation of the Mining Practice.

Senior Project Controls Manager, Stantec Consulting Ltd. , Potash Underground and head Frame Expansion

START Date
Experience Hours (Planning & Scheduling)
600
Experience Hours (Cost Management)
7200
Experience Hours (Forensic Analysis)
10000

(Potash Corporation of Saskatchewan, Vale Canada, BHPB Billiton, KGHM Victoria, Mosaic Potash, Cayeli Bakir Isletmelari A.S., Red Lake Goldcorp Inc., Glencore Canada Corp.,Lake Shore Gold Corp.)
This position is responsible for providing leadership and quality assurance to the project controls activities of the Stantec Mining Practice, the project controls team and client. This position performs a wide variety of project controls tasks, ranging from complex to routine, all of which contribute to efficient and professional operation of the Mining Practice.

Project Controls Specialist, CR Almeida Engenharia de Obras, Proposal Department

START Date
Experience Hours (Planning & Scheduling)
8300
Experience Hours (Cost Management)
8300
Experience Hours (Forensic Analysis)
8300

Planning and scheduling, cost estimating, earned value management, cost controlling and risk management

Vice President (Operations), Inc., PM tec, Aerospace and Defense programs with and without Earned Value (EV) requirement

START Date
END Date
Experience Hours (Planning & Scheduling)
11000
Experience Hours (Cost Management)
10000
Experience Hours (Forensic Analysis)
10000

Vice President - Technical Services - PM tec, Inc.

Served as Vice President for Technical Services for an established professional project management services company.

Led the company's professional services, consulting, and training staff, and managed PM tec's PM implementation services, training and software sales/implementation functions.

Senior Project Controls Manager, AECOM, DTRA and CBEP Program.

S
Sean Regan 👤 Member for 18 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
1000

Sr. Project Controls Manager and Acting Project Manager in support for Earned Value Management and Training of DTRA program inclusive of Reprogramming for $250 mil CBEP Program.

Performed Control Account Manager and EVP Certification training, review contracts and correspondance and coordinate team on reprogramming US government funded programs.

Project Controls Specialist, AREVA NP, Multiple Projects ; Oil and Gas / Nuclear / EPC Project Controls

START Date
END Date

·      Oversight of scheduling in AREVA Federal Services, including project schedulers, schedule processes and methodology, and schedule training

·      Develop & Maintain Project and Proposal Schedule

·      Conduct Schedule Quality Analysis utilizing Deltek Acumen

Planning Manager, Oceaneering, AMG Girassol, AMG Dynamic Bundles, Santos Exeter and Mutineer, ConocoPhillips Britsats

START Date
END Date
Experience Hours (Planning & Scheduling)
9000
Experience Hours (Cost Management)
1000

Recruitment and development of a planning team, planning tools and methodologies. Responsible for the management of a team of five planners engaged in planning projects and scheduling the area activities of R&D, Engineering, Fabrication, Manufacturing, Assembly, Testing and Offshore Installation. Played a key role as lead member of an International Continuous Improvement Team and core member of the Multiflex Project Management Process Improvement Team.

Oil & Gas Senior Planning Engineers - Primavera, Flexlife Ltd, Bacchus

START Date
END Date
Experience Hours (Planning & Scheduling)
1000

Implemented a Primavera P6 planning system running in a virtual Windows environment on an Apple Mac OS. Developed a master project schedule integrating a portfolio of Apache oilfield projects inclusive of Bacchus subsea tie-back to Forties Alpha.