Project Controls Lead, Camargo Correa, Unit Coke/HDT (Petrobras)
Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.
Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.
Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.
Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.
Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.
· Assured Contractor’s programme after contract awarded based on planning principles, Transmission Procedure 193, mandatory milestones, outages, links, budgeted cost and WBS mapping.
· Ensured Contractor’s programmes are fit for NEC3 type of contract – Option A –E.
My main experience is in Inspection, Virtual Design & Construction, Project Management and Project Controls in Infrastructure, Pharmaceutical, Mixed-Used, and Tunneling; delivering projects from planning to project occupancy and operation. Experience in USA, Europe, Asia and the Caribbean. I performed cost and schedule risk analyses on more than 100 infrastructure and pharmaceutical projects, including tunnels, airports, bridges, roads, and ports totaling more than $35B.
Earned Value Management Systems (EVMS), Project Controls and scheduling specialist. Owner of Rolls-Royce Defence Earned Value Management System description.
Accountable for maintaining site compliance to EIA-748
First point of contact with US DoD Defence Contract Management Agency for all matters in relation to validation EIA-748 EVMS.
Internal Surveillance Audits against requirements of EIA-748.
Development and delivery of Project Management training with emphasis on Earned Value and Scheduling
Associate at iPlan Consulting.
Claims analysis
Project planning
Project controls management.
- Preparing and updating the project baseline / master program.
- Preparing tender programs.
- Assist in standard work break down and implementation of same to schedule.
- Ensure resource planning is done adequately and monitor and maintain resource levels and forecasts.
- Preparing progress S-curve (Time wise/Man-hours) and manpower histograms.
- Preparation of commodity charts and tracking with actual for close monitoring.
- Establishment of Progress Measurement System.
- Preparing weekly look ahead program as per the master program.