Costing

Project Planning Engineer (Oil & Gas), Arabi Enertech, Installation of Crude transit Pumps at GCs and Replacement of Separator Control Valve at SEK GCs

J
Joyson John 👤 Member for 12 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
8850
Experience Hours (Cost Management)
8500
Experience Hours (Forensic Analysis)
3450
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Project Planning Engineer, Alghanim International General trading & Contracting Co., Construction of 500 MW OCGT Power Plant

J
Joyson John 👤 Member for 12 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2400
Experience Hours (Cost Management)
2400
Experience Hours (Forensic Analysis)
800
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Head of Project Controls, Adyard Abu Dhabi (Interserve), Various

START Date
END Date
Experience Hours (Planning & Scheduling)
3300
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
3000

1. Continuous Improvement of Project Controls systems.2. Procedures in place with 100% compliance.3. Project Schedules and Progress Measurement systems developed and monitored.4. Project budgets agreed and Cost Reports developed and monitored.5. Progress invoices to clients on time.6. Project manpower timekeeping systems in place.7. Procured items on schedule and within specification with savings8. Employee retention, promotion and succession planning.

Head of Project Controls, Adyard Abu Dhabi (Interserve), Various

START Date
END Date
Experience Hours (Planning & Scheduling)
3300
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
3000

1. Continuous Improvement of Project Controls systems.2. Procedures in place with 100% compliance.3. Project Schedules and Progress Measurement systems developed and monitored.4. Project budgets agreed and Cost Reports developed and monitored.5. Progress invoices to clients on time.6. Project manpower timekeeping systems in place.7. Procured items on schedule and within specification with savings8. Employee retention, promotion and succession planning.

Head of Project Controls, Adyard Abu Dhabi (Interserve), Various

START Date
END Date
Experience Hours (Planning & Scheduling)
3300
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
3000

1. Continuous Improvement of Project Controls systems.2. Procedures in place with 100% compliance.3. Project Schedules and Progress Measurement systems developed and monitored.4. Project budgets agreed and Cost Reports developed and monitored.5. Progress invoices to clients on time.6. Project manpower timekeeping systems in place.7. Procured items on schedule and within specification with savings8. Employee retention, promotion and succession planning.

Civil Engineer / Scheduler, Poyry Energy, Incoporated (Philippines), North Negros Bio Power Plant Project (NNBP)

START Date
Experience Hours (Planning & Scheduling)
1150
Experience Hours (Cost Management)
1150
Experience Hours (Forensic Analysis)
1150

Responsibilities:

  • Managed and scheduled remaining works in North Negros Bio Power (NNBP) 25MWe Biomass Power Plant located in Manapla, Negros Occidental Philippines. Includes coordination with Poyry Construction Team and NNBP O&M.
  • Designed additional structures as required by O&M (Operation & Maintenance) Team of NNBP Project including procurement coordination and construction supervision.

Senior Deputy General Manager, Lanco Infratech Limited, Chennai Metro Rail Package ECV-07

START Date
END Date
Experience Hours (Planning & Scheduling)
2450
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
1000

• Obtained Approval on Master Programme (Engineering, Procurement and Construction) with Planning Narrative Statement in the first submission.
• Obtained Notice of No Objection(NONO) from General Consultants EMBYE on critical construction drawings to create work front for casting of wider segments, Elevated Station and Cut and Cover Tunnel structural Works
• Establishment of Interface Management Plan and Traffic Management Plan
• Procurement of Subcontracts for Launching Girders, Normal Segments, Wider Segment Moulds, Tunnel Ventilation System Design
• Successfully Coordinated with Struct

Cost Engineer, Sasol, Functional Excellence Programme

START Date
END Date

To update monthly Cost Reports.Get signed approval of each Function Manager.Sort the Budget for the Project in total.Build Consolidated Master Documents.Built a process template in accordance with the timeline for each function per month.Tracking of functions expenditures and savings.Do SAP reports for all functions on a monthly basis.Built Pivot Tables in Excel.Budget, Actual and Forecast.Built S-Curves on a weekly basis.Built Cash flows on a weekly basis.Have weekly t

Cost and Planning Roving Supervisor, EEI CORPORATION EXO (Executive Office), Mandarin Hotel, Subic – Clark – Tarlac Expressway,

H
Harry Lameg 👤 Member for 9 years 4 months
START Date
END Date
Experience Hours (Planning & Scheduling)
800
Experience Hours (Cost Management)
800
Experience Hours (Forensic Analysis)
400

Monitors & evaluates planned & actual progress oforganization projects’ portfolio.• Checks & verifies reports of Cost and PlanningEngineers from different projects.• Checks the accuracy of projects’ plan, budget andactual values for performance measurement andmanagement reporting.• Checks & evaluates change order & claims (differentprojects)• Monitors Billing & Collection Status (differentprojects)

Deputy Planning Manager, Shapoorji Pallonji & Co Limited, Maruti-Suzuki India Limited- Automobile Factory construction

START Date
Experience Hours (Planning & Scheduling)
2450
Experience Hours (Cost Management)
1350

I am working currently as a Deputy Planning Manager in Shapoorji Pallonji Construction Private Limited on an Industrial Project in North Gujarat, India.

The Project Specifics.

Project value-Rs. 503 crs

Project duration - 29th January'15- till date.

Project Brief- Construction of Maruti-Suzuki Manufacturing Plant. I look after 

1) Press Shop

2) Weld Shop

3) Infrastructure- Roads, Storm water drains, Sewerage lines.

 

I look after the Project planning, scheduling, tracking, cost monitoring, project co-ordination, budgeting.