Change Orders
Pacific Region Construction Risk Manager / Senior Associate Director, Faithful & Gould, and other projects, General Mills Expansion
Western Region risk manager (Monte Carlo, Pertmaster, workshops) and owner agent (project controls, onsite representative, cost, schedule, contracts, change orders, invoices)
FIELD ENGINEER, TIC Canada, Epcor Clover Bar
Project: EPCOR Clover bar Energy-GE LM6000 CTG –Unit I-Power station Installation and
Commissioning Project.
Planner-Scheduler/Cost Control
Supervising Project Controls Specialist/Project Controls Lead, WSP|Parsons Brinckerhoff, Eastlink Final Design I90 LRT project in Seattle
- .
WSP | Parsons Brinckerhoff, Seattle, WA (2015)
:
This project entails modifications to 6.9 miles of the existing Interstate 90 highway – including a floating bridge and two tunnels.
Position Scope:
Project Engineer, Westfield, LLC, Roseville Galleria Mall Project
Project Engineer, Westfield, LLC (Roseville Galleria Project, CA)
• Worked for the largest retail investment group in the world on a $150 M
Project Engineer, Assisting Project Manager, FEDO (FACT Engineering and Design Organisation), India, •Consultancy services (Detailed Engineering, Procurement Assistance & Construction) for Ammonia Plant Revamp for M/s. Madras Fertilisers Ltd.: (1993-1997
Assistance to Project manager in
Lead Project Controller (Cost & Time), TECHNIP, Various Project with AMOCO, SHELL, EXON all over the world
Summary
>35 years working experience in Infrastructures (Buildings, Highways, Railroads) and Oil & Gas EPC Projects.
Actual Position: Project Control Manager
Education: Mechanical Engineer Graduate, Rome University, March 1974
Languages: English: Daily use at work; Italian: Mother tongue; French/Spanish: Fair
Computer Skills: Primavera P3/P6, MS Office
Specialties
Master Plans, WBS, Cost Control, Planning, Reporting, Delay Analysis, EoT Support, e