Budget Planning

Cost Engineer, Chevron Pacific Indonesia, Oil and gas pipelines, power transmission and distribution infrastructure, Integrated power system improvement reliability, Tank repair services for heavy oil operation, On-shore Pipeline Replacement, Upgrading Fa

START Date
Experience Hours (Cost Management)
950

- Develop business plan cycle for 3 years look ahead

- Capital project management portfolio monitoring

- Capital project management schedule predictability monitoring

- Quarterly Report to Management Steering Commitee

- Project control for major capital project

- Facilitator Cost and Schedule Risk Assessment for small capital project

Cost Engineer, Chevron Pacific Indonesia, Oil and gas pipelines, power transmission and distribution infrastructure, Integrated power system improvement reliability, Tank repair services for heavy oil operation, On-shore Pipeline Replacement, Upgrading Fa

START Date
Experience Hours (Cost Management)
950

- Develop business plan cycle for 3 years look ahead

- Capital project management portfolio monitoring

- Capital project management schedule predictability monitoring

- Quarterly Report to Management Steering Commitee

- Project control for major capital project

- Facilitator Cost and Schedule Risk Assessment for small capital project

Project Planner (SIB Projects For Anglo American), Sightfull - Anglo American, SIB Projects For Anglo American - Platinum, Amandelbult Section

START Date
END Date

Herewith some of the basic tasks I’ve done at the above mentioned company:

  • Attending Tender Meetings (To get information for tender program-schedule)
  • Design Tender Program-Schedule (With minimum detail –baseline program /schedule Level 1-2)
  • Attending Tender Award Meeting (To get information for more detail program/schedule Level 2-3)
  • Attending Site Meeting (To see site layout and getting the final detail )
  • Project Starts Visit Site (Start design a Construction program/schedule level 4-5)
  •  Attending Site M