%26 Project Planning; Progress Reporting; Primavera P6

Senior Scheduler, NB Power, Nuclear Power Generation

B
Bruce King 👤 Member for 10 years 4 months
START Date
Experience Hours (Planning & Scheduling)
4200

- Senior Scheduler with the Projects Dept. here at the Pt. Lepreau Nuclear Power Generating Station.

- All "Running Work" as well as short term (6 weeks) intense, jam packed planned and unplanned outages when station is shut down for capital work and/or large maintenance and fixes.

Construction Planning Consultant, PETROLEO BRASILEIRO S.A. - PETROBRAS - STEI SERVIÇOS TÉCNICOS, Construction Project of the Abreu e Lima Refinery

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
  • Responsible for ensure together with the Planning Engineer to integrate all the schedules of the construction Project of the Abreu e Lima Refinery.
  • Application the checklist in the schedules submitted by contractors to ensure the quality and integration of it.
  • Preparation of Physical Advancement curves and management reports to the Directors and the President of Petrobras.
  • Preparation and review of planning procedures..
  • Integration of all Project schedules by checking the interfaces between units and evaluating the impacts.
  • Realization the 4D Pla

full technical planning, Engefort engineering and construction., & Mining

START Date
END Date
Experience Hours (Planning & Scheduling)
350
Experience Hours (Cost Management)
400
Experience Hours (Forensic Analysis)
300

Activities: Schedule S & M, labor and equipment hand histogram , document control , RDO 's control, control and election of rain and stoppages in general , preparation of weekly and monthly curve, measurement services , tagueados materials and goods , monthly report , monthly physical and financial curve , supply schedule update , biweekly report coordination , updating quality indicators, update master schedule , updated organization chart, monthly report , photographic report , Primavera P8.2 System , Tailings Dam Project Pilar de Goias .

Project Planner, GTS-JV, New International Airport Islamabad

START Date
Experience Hours (Planning & Scheduling)
750
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
150

Guarantee Engineers-Thales-Selex (GTS-JV)

         Project Planner, July 2015 – Date

GTS-JV is responsible for the installation of Special Airport Systems at New Islamabad International Airport. I am working with a PMO formed by Pakistani and Italian professionals. As a Project Planner I am managing Primavera P6 Release 15.1 based schedule. Responsibilities includes the followings