Senior Scheduler, RLB | Rider Levett Bucknall, Multiple - Consulting Planner
Senior Scheduler - responsibilities include: contractor schedule reviews; developing CPM schedules for multi-level projects and programs
Senior Scheduler - responsibilities include: contractor schedule reviews; developing CPM schedules for multi-level projects and programs
Prepared All neccessary documents related to project controls on scheduleing ang billing requirements for a project on a monthly basis.
Project Controls Engineer
Planning, progress reporting, cost control of the water treatment plant works to the Medupi Power Plant Project in South Africa. Development and implementation of progress measurement systems within the company and integrating project controls with quality management standard to receive Iso: 21500
<h1>Sales Operation Manager Assistant.</h1>
I was in charge of studying new options and solutions for the Sales Department Tools.
I did also a big lead import job. This required Big data and SFDC knowledge.
Project Planner working on Deep Tunnel Storm Water main Conveyance Tunnel, Terminal Pumoing Station and Sea-outfall project with Stantec UK Ltd in Dubai, United Arab Emirates.
v Oct 2016 – Sep2018 – Al Ain General Contracting LLC, Abu Dhabi, Senior Planning Engineer
· Baseline programme preparationMonte Carlo Simulation.
· Updating CPM schedule on a monthly basis for the constructions and progress claims (Earned Value) Interim Payments purpose.
· Cost/Resource Loading (Cost, Quantity and Manpower Loading)
As Planning Engineer i am using Primavera P6 and lots of Excel
2003 ~ 2006
PARDIS Ammonia and Urea Project No.2
EP contract (Engineering, Procurement)
Applicant: Iran National Petrochemical Company
Contractor: Consortium of Toyo, Chiyoda & PIDEC
Position: Engineering planner and project controller
Key Responsibilities: