%100 Project Planning; Progress Reporting; Primavera P6

ANALYST / PLANNING ENGINEER, Shell bird Group, Palm Deira Island Pumping station infrastructure works

START Date
Experience Hours (Planning & Scheduling)
2200
Experience Hours (Cost Management)
700
Experience Hours (Forensic Analysis)
600

Monitored man hour booking, manpower, material, equipment status on a regular and ongoing basis for the project and highlight any discrepancies to the Project Manager/ Management.• Assisted in the development of manpower requirements for specific work disciplines and assist in resource levelling analysis to perform quantity and manpower resource loading for assigned schedules.• Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.• Identified and re

Junior Site Planning Engineer, Sime Darby Engineering, EPCI of Bunga Raya E Platform; EPCIC of Bunga Orkid A Platform

START Date
END Date
Experience Hours (Planning & Scheduling)
5500

1. Monitored and maintained progress report

2. Prepared weekly and monthly report

3. Prepared planning package for project and tendering 

Project Scheduler, FMC Technologies, Gumusut Kakap Subsea

START Date
END Date
Experience Hours (Planning & Scheduling)
4000

1. Maintained and updated engineering and production schedule of Subsea Manifold and Tie in System

2. Monitored progress of subsea valves manufacturing at Johor plant

3. Monitored progress of procurement for Riser

Planning & Scheduling Engineer, Siemens, Jebel Ali M-Station Ext

START Date

SIEMENS LLC

Jebel Ali Dubai, United Arab Emirates

Position              : Scheduling Engineer

Duration            : March 2015 – Present

Project               : 1200 MW JBL ‘M-Extension’ Combined Cycle Power Plant (DEWA)

 

 

Job Description:

Planning Engineer, Daewoo E&C, EGTL (Escravos Gas to Liquid Project)

START Date
END Date
  • Main scope includes Engineering, Procurement and Construction work (Temporary facilities, Civil, Architecture, UG/AG Piping, Mechanical, Electrical, Instrument, Insulation, Painting & Pre-Commissioning).
  • Developing of EPC Master Schedule using Primavera P6 Software , up to Level 5 as per contract requirement
  • Involved in preparation of Progress Measurement of Engineering, Procurement and Construction work, along with invoice submission.
  • Weekly/Monthly/Daily reports generation including ‘S’-curves for client & management review.
  • Resource planning c

PLANNING ENGINEER, SK Engineering & Construction, Takreer Refinery Expansion Project

START Date
END Date

Ø  Main scope includes Engineering, Procurement and Construction work (Temporary facilities, Civil, Architecture, UG/AG Piping, Mechanical, Electrical, Instrument, Insulation, Painting & Pre-Commissioning).

Ø  Able to understand the Technical Scope of work, Scheduling / Planning the appropriate set of activities and ensuring on timely completion of Project by Operating  Primavera Software.

Planning Engineer, Integral Services Co. W.L.L. (ISCO), Kuwait National Petroleum Company (K.S.C.) Clean Fuels Project (CFP)

START Date
END Date

Ø  Main scope includes Procurement and Construction work (Temporary facilities, Shutdown Tie-in work, Civil, Architecture, AG Piping, Mechanical, Electrical, Instrument, Insulation, Painting & Pre-Commissioning).

Ø  Able to understand the Technical Scope of work, Scheduling / Planning the appropriate set of activities and ensuring on timely completion of Project by Operating  Primavera Software.

Area Planning Engineer, Sicim Kazakhstan, FGP /WPMP

START Date

Ø  Main scope includes Engineering, Procurement and Construction work (Temporary facilities, Civil, UG Piping, Electrical, Instrument and Pre-Commissioning).

Ø  Able to understand the Technical Scope of work, Scheduling / Planning the appropriate set of activities and ensuring on timely completion of Project by Operating  Primavera Software.

Ø  Developing of EPC Master Schedule using Primavera P6 Software and updates on weekly basis.