Works: Fabrication of Material Handling Equipment, Gear Case, Crusher, Mfg.of Gear box
Jobs involved
Fabrication of Intermediate stand conveyor, Crushing Platform & structures.
Fabrication of Gear box case & assembly of helical gearbox.
CNC Programming of CNC Lathe, PGC
CNC Operating of Profile Gas Cutting M/c, CNC Lathe, Milling center
Duration: Dec-2000 to June-01 Designation: Tr. Engineer
Works: Fabrication of Nuclear vessel, radioactive storage devices, Heat Exchanger, Pressure Vessel, Furnace.
Job Responsibilities
Fabrication of Nuclear Vessel, Heat Exchanger, P/V, Electrically Heated Calcination Furnace.
Fabrication of Lead shielded cask.
Dimensional & Welding Inspection of the above jobs.
Iron Content, Chloride content, Acid Content testing of Nuclear vessel
Duration: Dec-03 to Jan-04 Designation: Engineer
Project: Shut Down Job
Job Responsibilities
Replacement of Heater Coils (4’, 10”) for Super heaters in Hydrogen Plant
Cladding of Monel Plats (1000 x 300 x 3 thk) in Cocker Fractionator Column.
Fabrication of Alloy steel piping for FCC plant.
Client: M/s L’Oreal Paris. Pune
Consultant: M/s Kvaerner Powergas India Ltd.
Duration: March-03 to Nov-03 Designation: Jr.Engineer
Project: Mechanical Piping & Equipment Erection of Cosmetic Plant for L’Oreal Paris.
Project: Construction 1260 TPD Air Separation Unit at Ispat industries Ltd. Pen. Raigadh.
Job Responsibilities
Preparation of Fabrication & Erection Schedule for Structure using Primavera.3.1
Preparation of Fabrication & erection schedule according to Structure & Equipment Erection Schedule
Progress Monitoring Planned Vs. actual
Fabrication & Erection of 55 Mtr HT Cold box & Exchanger box structure
Fabrication & Erection of Aluminum, SS, CS & UG Piping
Erection & Alignment of Air Separation Columns, Heat Exchangers - inside Cold box structure
Project: Kaiga Atomic Power Project 3&4
Fabrication & Erection of Primary Piping Service & Equipment of Reactor Building
Job Responsibilities
Preparation of Pre Fabrication & Erection schedule of Nuclear Piping Services according to Priority / Material & Manpower availability.
Preparation of work front, worker allocation & resource allocation reports
Fabrication & Erection of CSRB System Piping & Equipments.
Progress recording & project monitoring.
Preparation of RA bills using Work Contract Management System.
Civil Engineering works included
Senior Manager Planning