Duration: Dec-03 to Jan-04 Designation: Engineer
Project: Shut Down Job
Job Responsibilities
Replacement of Heater Coils (4’, 10”) for Super heaters in Hydrogen Plant
Cladding of Monel Plats (1000 x 300 x 3 thk) in Cocker Fractionator Column.
Fabrication of Alloy steel piping for FCC plant.
Client: M/s L’Oreal Paris. Pune
Consultant: M/s Kvaerner Powergas India Ltd.
Duration: March-03 to Nov-03 Designation: Jr.Engineer
Project: Mechanical Piping & Equipment Erection of Cosmetic Plant for L’Oreal Paris.
Job Responsibilities
Erection & Alignment of Rotary & Static Equipment.
Fabrication & Erection of SS & CS Piping.
Planning & Scheduling of Piping & Equipment Erection.
Preparation of MTO Based on GAD & P & ID
Preparation of As Built ISO Drgs.
Mechanical Clearance & Testing of Services
Co- Ordination of Site Queries, Drg. Queries with Site, Consultant & Client.
Inspection & Documents Acceptance as per BVQI.
Material Utilization & Progress Monitoring.
Main Contractor: M/s Toyo Engineering India Ltd.
Consultant: Foster Wheeler UK
Main Client: M/s Petronet LNG Ltd. Dahej.
Duration: June 02 to Feb-03 Designation: Jr.Engineer
Project: Fabrication & Erection of UG Fire fighting System, Cross-Country Pipeline for Water.
Job Responsibilities
Preparation of Detailed ISO Drawings based on Plot Plant & P & ID.
Fabrication & Erection of UG Fire Fighting Piping
Fabrication & Erection of Cross Country pipeline
NDT Co ordination, x-ray Film interpretation & Repair tracing on weld joints
Weld visual & DPT inspection weld joints
Contractor: Afcons Infrastructure Ltd. / Ballast Nedam International – Netherlands.
Consultant: Foster Wheeler UK
Main Client: Petronet LNG Ltd. Dahej
Duration: Oct-01 to June-02 Designation: Jr.Engineer
Project: Fabrication of Off shore Piles, Steel Structure Platform, Sleepers, and Trays.
Job Responsibilities
Fabrications of Off shore Piles, Fabrication & Erection of Off shore steel structures, trays, and platform.
Welding Inspection, Preparation of Inspection reports as per TPI Foster wheeler UK
Taking care of Surface Preparation & Painting.
DFT, Holiday testing, Adhesion test of Painting, Inspection of Surface Preparation
Project Billing & Certification
Project: Shut Down Job
Job Responsibilities
Replacement of Heater Coils (4’, 10”) for Super heaters in Hydrogen Plant
Cladding of Monel Plats (1000 x 300 x 3 thk) in Cocker Fractionator Column.
Fabrication of Alloy steel piping for FCC plant.
Client: M/s L’Oreal Paris. Pune
Consultant: M/s Kvaerner Powergas India Ltd.
Duration: March-03 to Nov-03 Designation: Jr.Engineer
Project: Mechanical Piping & Equipment Erection of Cosmetic Plant for L’Oreal Paris.
Job Responsibilities
Erection & Alignment of Rotary & Static Equipment.
Fabrication & Erection of SS & CS Piping.
Planning & Scheduling of Piping & Equipment Erection.
Preparation of MTO Based on GAD & P & ID
Preparation of As Built ISO Drgs.
Mechanical Clearance & Testing of Services
Co- Ordination of Site Queries, Drg. Queries with Site, Consultant & Client.
Inspection & Documents Acceptance as per BVQI.
Material Utilization & Progress Monitoring.
Main Contractor: M/s Toyo Engineering India Ltd.
Consultant: Foster Wheeler UK
Main Client: M/s Petronet LNG Ltd. Dahej.
Duration: June 02 to Feb-03 Designation: Jr.Engineer
Project: Fabrication & Erection of UG Fire fighting System, Cross-Country Pipeline for Water.
Job Responsibilities
Preparation of Detailed ISO Drawings based on Plot Plant & P & ID.
Fabrication & Erection of UG Fire Fighting Piping
Fabrication & Erection of Cross Country pipeline
NDT Co ordination, x-ray Film interpretation & Repair tracing on weld joints
Weld visual & DPT inspection weld joints
Contractor: Afcons Infrastructure Ltd. / Ballast Nedam International – Netherlands.
Consultant: Foster Wheeler UK
Main Client: Petronet LNG Ltd. Dahej
Duration: Oct-01 to June-02 Designation: Jr.Engineer
Project: Fabrication of Off shore Piles, Steel Structure Platform, Sleepers, and Trays.
Job Responsibilities
Fabrications of Off shore Piles, Fabrication & Erection of Off shore steel structures, trays, and platform.
Welding Inspection, Preparation of Inspection reports as per TPI Foster wheeler UK
Taking care of Surface Preparation & Painting.
DFT, Holiday testing, Adhesion test of Painting, Inspection of Surface Preparation
Project Billing & Certification