Neo Structo Const. Ltd Mechanical Engineer

Duration: Dec-03 to Jan-04          Designation: Engineer

Project: Shut Down Job

Job Responsibilities

Replacement of Heater Coils (4’, 10”) for Super heaters in Hydrogen Plant

Cladding of Monel Plats (1000 x 300 x 3 thk) in Cocker Fractionator Column.

Fabrication of Alloy steel piping for FCC plant.



Client: M/s L’Oreal Paris. Pune

Consultant: M/s Kvaerner Powergas India Ltd.

Duration: March-03 to Nov-03          Designation: Jr.Engineer

Project: Mechanical Piping & Equipment Erection of Cosmetic Plant for L’Oreal Paris.

Job Responsibilities

Erection & Alignment of Rotary & Static Equipment.

Fabrication & Erection of SS & CS Piping.

Planning & Scheduling of Piping & Equipment Erection.

Preparation of MTO Based on GAD & P & ID

Preparation of As Built ISO Drgs.

Mechanical Clearance & Testing of Services

Co- Ordination of Site Queries, Drg. Queries with Site, Consultant & Client.

Inspection & Documents Acceptance as per BVQI.

Material Utilization & Progress Monitoring.



Main Contractor: M/s Toyo Engineering India Ltd.

Consultant: Foster Wheeler UK

Main Client: M/s Petronet LNG Ltd. Dahej.

Duration: June 02 to Feb-03          Designation: Jr.Engineer

Project: Fabrication & Erection of UG Fire fighting System, Cross-Country Pipeline for Water.

Job Responsibilities

Preparation of Detailed ISO Drawings based on Plot Plant & P & ID.

Fabrication & Erection of UG Fire Fighting Piping

Fabrication & Erection of Cross Country pipeline

NDT Co ordination, x-ray Film interpretation & Repair tracing on weld joints

Weld visual & DPT inspection weld joints



Contractor: Afcons Infrastructure Ltd. / Ballast Nedam International – Netherlands.

Consultant: Foster Wheeler UK

Main Client: Petronet LNG Ltd. Dahej      

Duration: Oct-01 to June-02          Designation: Jr.Engineer

Project: Fabrication of Off shore Piles, Steel Structure Platform, Sleepers, and Trays.

Job Responsibilities

Fabrications of Off shore Piles, Fabrication & Erection of Off shore steel structures, trays, and platform.

Welding Inspection, Preparation of Inspection reports as per TPI Foster wheeler UK

Taking care of Surface Preparation & Painting.

DFT, Holiday testing, Adhesion test of Painting, Inspection of Surface Preparation

Project Billing & Certification