Saudi Arabia (AS.SA)

SA

Senior Project Controls /Planning Engineer, SABIC PMT, YANSAB- SABIC

START Date
END Date
Experience Hours (Planning & Scheduling)
8000
Experience Hours (Cost Management)
4000

Responsibilities included designing logical schedules for new projects, creating monitoring tools and analysis. Additionally, integrated pre-commissioning and commissioning of eight petrochemical facilities.

  • Monitored coordination of commissioning activities between facilities.
  • Ensured start-up activities adhered to flawless start-up methodologies
  • Ensured compliance with local standards and regulations
  • Delivered timely progress, quality assurance and budget reports

Senior Project Controls /Planning Engineer, SABIC PMT, YANSAB- SABIC

START Date
END Date
Experience Hours (Planning & Scheduling)
8000
Experience Hours (Cost Management)
4000

Responsibilities included designing logical schedules for new projects, creating monitoring tools and analysis. Additionally, integrated pre-commissioning and commissioning of eight petrochemical facilities.

  • Monitored coordination of commissioning activities between facilities.
  • Ensured start-up activities adhered to flawless start-up methodologies
  • Ensured compliance with local standards and regulations
  • Delivered timely progress, quality assurance and budget reports

Planning Engineer, Tekfen Construction and Installation Co., Yanbu - Jeddah Pipelines Project

START Date
END Date
Experience Hours (Planning & Scheduling)
1800



Employer: Saudi Aramco

Project Budget: 300,000,000 USD



Project Description: 20”x333.5 km gasoline, 24”x333.5 km diesel & jet A1 pipeline. 8 valve stations, 4 scraper traps, 430 km of fiber optic cable, 19 nos. thrustboring, cathodic protection etc.

Construction Project Control Manager, RICHMOND ENG’G & MANAGEMENT , Corniche Park Project

START Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
1500

Projects Involved:  COMMERCIAL, BUILDINGS, OFFICES, LANDSCAPE & HEALTHCARE

  • This project comprises of Two Zones. The First Zone includes Restaurant Quarters that includes three – Buildings having 7 – Restaurant, Hardscape & Softscape, Utilities & Car Parking’s. The Second Zone includes Office Building having Retail Shops & Offices. This also includes Dry Fountain.

Duties & Responsibilities:

Sr. Project Control Engineer, Projacs International/Egis, Abha Regional Airport Development Project

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000

Package: (1,791,769,864.00 S.R. Contract Value):

  • This Package includes original scope of the contract that includes the construction of the following facilities in an existing airport, Airside Works, External Works, Bridges, Retaining Walls, Facilities & Utilities, Building Works, Passenger Terminal Buildings, and Renovation of existing Buildings & Meteorology Facilities.

Duties & Responsibilities:

Jean Terblanche

First Name
Jean
Last Name
Terblanche
Professional Since
Oldest experience
Years Experience
1
Telephone Number
+966 55 821 3759
LinkedIn Profile
https://www.linkedin.com/in/jean-terblanche-41301314/

I have 18 years’ international experience in providing commercial, contractual and technical project controls services and advice to contractors and subcontractors in relation to a wide range of industry sectors including building, heavy civil engineering, infrastructure, process engineering, mechanical engineering, electrical engineering, petrochemical engineering, construction projects, procurement and contract management.

Engineer / Project Engineer, COST Contemporary structure co. , Fuel oil loading modification system /civil/Mechanical/Electrical

START Date
END Date
Experience Hours (Planning & Scheduling)
100
Experience Hours (Cost Management)
100
Experience Hours (Forensic Analysis)
100

- Managing SA ARAMCO project civil activities.
- Study about the contract, scope of work, standards, specification and milestone dates.
- Study the IFC DWG and make overlap between civil and other disciplines DWGs.
- Assisting planning engineer for preparing the look ahead schedule & recovery planning based on the construction progress.
- Attending the weekly meeting for design, procurement and construction to discuss the status of design package, material site requirement and work progress as per the schedule.
- Assisting procurement department by reviewing the Material request,
Pur