United Kingdom (EU.UK)

GB

Constrution Manager, Interior Services Group, Bank Boston, Eurostar premier departures loung at Waterloo, Freshfeilds Bruckhaus Deringer, Hiscox Insurance, Imperial Colldge, Programmer at Eurostar St Prancas

START Date
END Date

We I first joined ISG I was employed as an assistanst construction manager and shortly joining the company trained and coached me to manage my own projects.  During the time I was employed at ISG I was promoted me to a construction manager then finally a senior construction manager where I was undertaking larger and more complex projects not only in fit out but refurbishment projects in the Mayfair and Kensington areas.  Most of my duties were site based, however as I became more experienced my role developed more into design managment responsibilities where I would chair design m

Permanent Employment United Kingdom (EU.UK) £50,000 to £60,000

planner, volka, & Oil & Gas Projects 2) Buildings 3) Infrastructurus

START Date
END Date

Responsible for preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of

work in Primavera version P3.1  P6.

 Developed the (MTS) level 4 integrated EPC (Engineering, Procurement and Construction) schedule based on

contract requirements in cooperation with the Managing Contractor on Primavera.

Updated and reviewed the BSC (Balanced Score Card) for projects. Conducted several presentations for the

site team in order to highlight the importance of BSC.

4D Planner, Volka, 12 High Ends Residential/Condominiums Building Project

START Date
END Date

Responsible for preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of

work in Primavera version P3.1 & P6.

 Developed the (MTS) level 4 integrated EPC (Engineering, Procurement and Construction) schedule based on

contract requirements in cooperation with the Managing Contractor on Primavera.

Updated and reviewed the BSC (Balanced Score Card) for projects. Conducted several presentations for the

site team in order to highlight the importance of BSC.

Lead/Senior Planning Engineer, Shell, Conoco, Esso, Technip Maritime, Cameron Ltd, Ormen Lange Mid North, Norway

J
John Telfer 👤 Member for 12 years 9 months
START Date

Over 30 years extensive on/offshore experience of major overseas projects (Norway, USA, Iraq, Azerbaijan and France) including Oil & Gas Industry projects as planning engineer for:

- subsea projects including gas export production system tied back to onshore

- engineerng planning for early phase projects such as FEED and pre-FEED

- subsea equipment systems planning and schedule risk evaluation

- subsea well intervention vessel planning

- Jack up platform EPC and installation schedules for offshore installation

- FPSO project

-

Lead/Senior Planning Engineer, Shell, Conoco, Esso, Technip Maritime, Cameron Ltd, Ormen Lange Mid North, Norway

J
John Telfer 👤 Member for 12 years 9 months
START Date

Over 30 years extensive on/offshore experience of major overseas projects (Norway, USA, Iraq, Azerbaijan and France) including Oil & Gas Industry projects as planning engineer for:

- subsea projects including gas export production system tied back to onshore

- engineerng planning for early phase projects such as FEED and pre-FEED

- subsea equipment systems planning and schedule risk evaluation

- subsea well intervention vessel planning

- Jack up platform EPC and installation schedules for offshore installation

- FPSO project

-