Gary Tate
Gary Tate
Ian Morrice
Steve Dunbar
Planning Enginner, progressed to Planning Manager between 1985 and present.
Planning role from project inception and feasiabiliy studies through tender and construction period and then some experiance in post contract works. I have been involved in both the prepertation of claims and in the preperation of claims.
Project experiance includes: building, civil enginnering and railway works. Huge range of values from £100k to £250m.
Some experiance with mentoring planning staff.
Started with stencils and a slide rule - and have seen the arrival and de
Thomas Kelly
Contracts Manager, Jerram Falkus Construction , Winsor Primary School
Contracts Manager for a Main Contractor in London working on Education and residential projects.
Roles and resposabilities:
Pre-construction planning
Procurement
Programming
Ensuring good practice of Health, Safety and Environmental
Design Co-ordination
Stakeholder Management
Sub-Contractor Management
Quality management
Planning Engineer, Doosan Babcock, Various Maintenance Projects
Oct 2008 – Jan 2009
Doosan Power Systems (Doosan Babcock)
Trainee Planning Engineer – Cockenzie PS
Key Responsibilities:
- Using Microsoft Project 2003 to create project plans
- Selecting the appropriate techniques and sequences
senior planner, cbi, scpx
Principal / Senior Planner in refinery and oil and gas engineering