Logistics Supervisor, Duco Ltd (Part of Technip Group), Chevron Agbami, PDVSA Dragon HFL's, Vetco Gray Kipper Tuna

START Date
END Date

Supervising a small team of four Logistics Engineers in controlling the umbilical manufacture within the Manufacturing facility.

  • Performing the duties of a Logistics Engineer:
  • Engineering review and analysis of non-conformance reports, facilitation of technical review meetings and control of project costs including variation orders.  Co-ordinating fitting of hardware and final testing inline Duco’s Quality systems, ISO9001 and API requirements.

Logistics / Planning Manager, Duco Ltd (Part of Technip Group), BP Andrew Kinnoull, BP Skarv, Chevron Agbami, Encana Deep Panuke, Mearsk Dumbarton & Lochranza, Murphy Azurite, Talisman Auk North, Total Islay

START Date
END Date

Areas of Responsibility: Project / Manufacturing & Applications Planning, Logistics Engineering and Project Shipping.

Role Responsibilities:

  • Overseeing tender plans and project planning to ensure that the requirements of the client are achieved.
  • Overall planning management of the factory ensuring the factory runs at optimum capacity.
  • Ensuring umbilicals are manufactured and tested in line with the client’s specifications and to ISO systems.
  • Strategic monthly forecasting for production man-hour requirements, machine capacity, and rev

Planning Manager, IHC Engineering Business Ltd, Technip Pipelay Vessel - J Lay Tower

START Date
END Date

Areas of Responsibility: To set up a full Planning system within the organisation.

Role Responsibilities:

  • Analysis of current planning systems and practices.
  • Implementation of new planning software Primavera P6.
  • Documenting full procedures on requirements of planning across the business.

Strategic weekly / monthly forecasting for man-hour requirements across multiple disciplines and projected completion revenue costs and other management reporting.

Technology Planner, Wellstream International Ltd, Research & Development Projects

START Date
END Date

Areas of Responsibility: Setup and control the Planning function within the Technology department

Role Responsibilities:

  • Implementation of Wellstream planning systems within the Technology department utilising software Primavera P5.
  • Generation of Research and Development Projects for new pipe designs to enhance Wellstream’s future market strategy.

Reporting targets and results during the life of projects.

Andrew Ponting

First Name
Andrew
Last Name
Ponting
Years Experience
0

I have been working within Project Controls for six years.  I spent a year doing Cost Engineering, Risk and Change Control.  The last 5 years I have been a Planning Engineer.  My latest project which I have been on for two and half years is a £125 million, Nuclear Construction Project.  I undertake all aspects of Planning, I am involved in from Earned Value Anaylysis, Schedule Scrutiny, Interactions with the contractor, the project managers and Senior Mnagement. In addition I am a member of the Association of Project Managers,

Contract Planner, Carillion Construction, London 2012 Olympics International Broadcast Centre

START Date
END Date

International Broadcast Centre and Media Hub Enabling Works (£2.5m)

Contract Planner for design and construct contract under NEC 3 ECC Contract Conditions. Works located within 2012 Olympic Park to provide enabling works for the construction of the international broadcast studios and press offices.

james tuffin

First Name
james
Last Name
tuffin
Oldest experience
Years Experience
2

 

I joined Mowlem in 2001 as Section Engineer, working up to Sub Agent shortly after the Carillion aquisition. After completing a project in Bristol, I was asked to produce some tender programmes for the bid team. It was at this stage that I was approached to work as a Contract Planner on a full-time basis.

Contract Planner, Carillion Construction, Great Yarmouth, Outer Harbour, Scope G

START Date
END Date

Outer Harbour – Scope G Works (£2.1m)

 

Tender and Contract Planner for construct only contract under FIDIC Conditions of Contract, 4th Edition. Works located at Great Yarmouth Outer Harbour development to provide around 41,000m² hard-standings to create an operation port area. Contract involved the construction of block paving areas complete with electrical ducting, lighting towers 40m in height, approx.