Cost Controler, "KBR (Kellogg, Brown & Root) Design & Construction", Orbit Multi-Modal Study

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

Orbit Multi-Modal Study – Transport Planning, 2001 - 2003 This was a major transport study, the overall aim of which was to develop a long-term management strategy for the M25. Responsibilities included timesheet and hours monitoring, fee and cost monitoring (including resolving disputes with the client), plus input into project planning.

Planner (claim), Halliburton KBR, A13 DBFO Thames Gateway

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

A13 DBFO Thames Gateway (claim) – Highways DBFO, 2003 - 2004 Mark carried out the planning for this difficult project in its closing stages. This extremely challenging role on a project claim included interrogation of earlier versions in P3 of the programme for structures and highways and liaising closely with a claims consultant, client and contractors. Mark also provided historical time and cost breakdowns of staff hours for this Highways Agency project.

Cost Controler, KBR, M25 Rapid Widening

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

M25 Rapid Widening, 2003 - 2004 Mark was responsible for collating and reporting hours and cost data for this project. He also obtained and collated traffic data and junction data from consultants and local authorities which included regular liaison with councils and the Highways Agency. The data formed the basis of a project report.

Planner, Consulting, KBR, Lower Lea Valley Underground Power Lines

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

Lower Lea Valley Underground Power Lines – Tunnels, 2004 - 2005

Project planning for this cable tunnel project which was being developed in support of the London Olympics. Planning included producing five different options for the construction phases of this LDA sponsored work in Primavera 3e/c (P5). This project consists of two 6km tunnels under east London, currently under construction.

Senior Planner, KBR, Conlog / TDA

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

CONLOG / TDA – Construction, Defence, 2004 - 2008 Mark became senior planner for Defence Services planning and scheduling and was responsible for a large number of MoD and Home Office projects, from bids through the entire project life from design through procurement, logistics and construction to completion. This included creation of task lists, WBS, logic-linked / closed-network schedules, critical path analysis, delay mitigation and progress updates on all projects plus the development of an overarching department programme.

Lead Planner / Senior Planner - London., Atkins, Hydrus

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

Design House for AWE – Defence / Nuclear, May 2008 – January 2011

Mark joined Atkins as a planner on Atomic Weapons Establishment projects where Atkins is the Design House. Design typically exceeds a value of £20m and forms a major part of these projects.

Lead, Atkins, Crossrail (TCR station improvement)

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

Crossrail (TCR station improvement) – Light Rail, Jan 2010 – Dec
Lead planner on this project supporting the broader and high profile Crossrail project. This includes liaising with managers and lead engineers, planning and scheduling, performance measurement (SPI & CPI) and creating new baselines on this design project.

Lead Planner / Senior Planner - London., Atkins, Gatwick Pier 6

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

GAL – Gatwick North Terminal, Pier 6 Extension - Airports Lead planner on this project that forms part of North Terminal developments to enable it to take the A380 aircraft. This includes building programmes, creating a system of reporting to comply with BAA requirements, monthly updates, advising management on PC issues, delay analysis and performance figures.