Italy (EU.IT)

IT

4D Planning Consultant update base line schedule review, Delta Srl, Lom Pangar Pipeline Modification Project - Cameroon (Sicim/Exxon Mobil 50 MM , Zubair Oil Field Development Project - Iraq (Sicim/ENI 430 MM USD)

START Date
END Date
Experience Hours (Planning & Scheduling)
400
Experience Hours (Cost Management)
400

Junior Planner - Delta Srl - Matera, Italy
(September 2011 – Marc 2013)

- Building up and progress control of project plan with creation of resources diagram.

- Variance analysis between actual curves and planned curves.

- Tools: Primavera P6, MS-Project, Excel.

Projects: Lom Pangar Pipeline Modification Project - Cameroon (Sicim/Exxon Mobil 50 MM USD) - Zubair Oil Field Development Project - Iraq (Sicim/ENI 430 MM USD)

Engineering support Project planning, STE Energy Spa, Plannig field engineers activities, CAD modelling, preliminary design of photovoltaic systems

START Date
END Date
Experience Hours (Planning & Scheduling)
250
Experience Hours (Cost Management)
100

Support Engineer – Energy Manager STE-Energy Spa - Taranto, Italy
(January 2012 – October 2012)

- CAD Modelling (AutoCAD).

- Shade analysis and preliminary design of photovoltaic systems.

- Drawing up lists of activities for field engineers.

Production Engineer, Sindiam Srl, Production control

START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
200

Production Engineer - SINDIAM Srl – Senise (PZ), Italy (March 2013 –June 2014) - Production control and data mining. 2 departments: 16 machine tools and 20 Workers) - Introduction and improvement of KPI and develop of Statistic analysis of manufacturing process in accord with continuum improvement philosophy. - Application of lean manufacturing thinking.

Contract Production Supervisor & Controller, Cosmet Srl, Production bottleneck analysis

START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
0

Production Consultant - COSMET Srl – Rotondella (MT), Italy
(March 2014 –October 2014)

- Introduction and improving of a direct costing system to obtain a real full costing scheme.

- Work flow analysis to understand the production bottleneck. (3 departments, 20 workers)

- Performance and process analysis and development of new KPI.

Project Planner, Eni Spa, ENI-COVA general Shutdown and turnaround

START Date
END Date
Experience Hours (Planning & Scheduling)
300
Experience Hours (Cost Management)
100
Experience Hours (Forensic Analysis)
0

Project Planner - ENI Spa – Matera, Italy (October 2014 – April 2015) - Planning and progress control TAR activities (ENI-COVA general Shutdown and turnaround). -Reporting and scheduling progress activities. -Tools: Primavera P6, Ms Project and Excel.

Change & Project Controls Manager, ABB, 111 MW Subic Power Plant

START Date
Experience Hours (Planning & Scheduling)
2800
Experience Hours (Cost Management)
2800
Experience Hours (Forensic Analysis)
2800

Good experience in the Project Control Area: in the beginning as planning engineer, then as responsible for cost control activities, and from 2002 as Project Control Manager.

Main fields: EPC contracts in the oil & gas field, gas and cogeneration plants, power plants, offshore projects, FPSO, FRSU.