SCHEDULER CONTROLLER, JAPAN GAS CORP (PHILIPPINES), ELBA EASTERN – SERAYA 2 PROJECT

START Date
END Date

• Responsible for checking of revision as prepared on drawing plan for Process and Instruments Diagrams and translates its

revision on compiled Master Plan needed for turnover system databases.

PLANNING ENGINEER, DAVY OMEGA (SEA) PTE LTD seconded to PFIZER ASIA PACIFIC PTE LTD, PFIZER BULK PHARMACEUTICAL PLANT PROJECT

START Date
END Date

The contract duration was intended for a short period for the purpose of monitoring on remaining works during final phase of construction and

commissioning.

PLANNING ENGINEER, DAVY OMEGA (SEA) PTE LTD seconded to SIEMENS PTE LTD, CHANGI AIRPORT WATER RECLAMATION PROJECT

START Date
END Date

 The contract was intended for a short period of project bid preparation for Siemens client

• Review all client’s bid

SENIOR PLANNING ENGINEER, JURONG ENGINEERING LTD, PULAU SERAYA POWER STN STAGE 1-ORIMULSION PROJECT

START Date
END Date

• Monitor, review, analyses and updates the project plans, schedules, progress measurement, resource utilization, equipment

utilization, commissioning activities, etc and prepares its monthly job

SENIOR PLANNING ENGINEER, Foster Wheeler Eastern Pte Ltd, SINGAPORE PARALLEL TRAIN PROJECT / UNIT IV BARLONGAN REFINERY REVAMP PHASE II PROJECT

START Date
END Date

• Responsible for all planning and scheduling activities for all company’s on-going and new projects.

• Responsible for the prep

LEAD PLANNER/SCHEDULER, KELLOGG BROWN & ROOT ASIA PACIFIC PTE, JDA BLOCK B-17 FIELD DEVLOPMENT PROJECT PHASE 1

START Date
END Date

 • Responsible for up-keeping & maintenance of database of front-end engineering deliverables and non-deliverables.

• Respons

PROJECT PLANNER / SCHEDULER, BOVIS LEND LEASE PHARMACEUTICAL PTE LTD, LBXS BIOREACTOR PLANT 2 PH 4

START Date
END Date

• Responsible for the revised Master Schedule for determining each activities category and classification including the location and

area requirements.