Phil. Nuclear Power Plant, Phase I Bataan, Philippines
Performed planning, scheduling, monitoring and supervision for the construction of ten (10) kilometers access road and installation of main water supply systems to power plant. Works involved earthwork, surveying, pumps installation and construction of pump houses. Similarly, responsible for the fabrication and erection of structural steelworks.
Sep 1980 to Sep 1982 - Quality Control Engineer
Field Supervisor
Engineering Equipment Inc.
Main Office assignment in the Philippines
Assigned temporarily to Quality Control Department and responsible for the formulation and implementation of quality control plan, inspection and testing.
Alternate CQC Representative
D.A. Silvestre and Associates
Essential Maintenance Facility Phase II
United States Airforce, Clark Air Base, Philippines
•Preparation of Electrical and Instrumentation Construction Master Schedule up to Primavera Level 4, including resources and code and schedule monitoring.
•Preparation of Weekly Progress Monitoring and Plan forecasting base on P3 resources.
•Preparation of monthly and weekly report.
•Schedule analysis for Interfacing Activity and Critical Activity base on Original base line and preparation of recovery schedule.
•“S” curve and Histogram preparation for KPI monitoring.
•Preparation of progress claim data.