PH
Philippines (AS.PH)
Design Coordinator/Planner, ALT Inc., Main Office
v Prepares Project Schedule (Bar Chart and S-Curve) using Primavera Project Planner (P6).
v Details the schedule based on the present condition/workability of the project
v Analyses variances on time and resources.
v Maintains an updated plan and as-built schedule.
v Generates and recommend resources requirements.
v Accountable for workability of plans and schedules.
Engineering Equipment International Corp. (EEI) Project Controls Engineer
Controls outgoing and incoming cost of the project.
EEI Corporation Trainee Planner
January 1995- September 1997
EEI Corporation, Manila, Philippines
Site Engineer from 1994 through 1996 & Scheduling Engineer until 1997, in charge of planning, scheduling, coordination, and monitoring of engineering and construction activities. Supported several EEI Engineering & Construction Projects using Primavera system computerized CPM methodology.
Duties
Planner
Current Role
eei corp Planner
Current Role
Pagination
- Previous page
- Page 102
- Next page