Indonesia (AS.ID)

ID

PT Thiess Contractors Indonesia Project Controls Engineer

1.     Implement and maintain controls system to allow accurate and timely financial reporting for the project.

2.     Prepare monthly valuations.

3.     Maintain the project schedule.

4.     Progress updating and monitoring regularly.

5.     Prepare all variation works for monthly progress claims.

6.     Supervise and review final quantities calculation.

Sumitomo Corporation Senior Planner

1.     To improve and reviewing Master Schedule of Sub-contractor (PT. Rekayasa Industri and Fuji Electric System).

2.     To ensure consistency of all reports of Sub-contractor.

3.     Updating Master Schedule for reporting (Monthly Report).

4.     CPM analysis and recovery plan.

5.     Resources Allocation Plan.

6.     Resources productivity analysis.

7.     EVA (Earn Value analysis).

8.     Reporting and monitoring all resources of sub-contractor against plan and compared to progress achievement.

FABTECH PROJECTS & ENGINEERS LIMITED Lead Planner

•     Prepare, monitor, maintain project master schedule for engineering and compile into support procurement schedule, man-power loading/staffing histogram for current project and bidding new project and checking the sequencing of the activity.

•     Prepare S-Curve for compare the planning target with the actual progress, showing the progress calculation, S- Curve per each discipline of project activities and every week. Preparing 3 weeks look ahead schedule.

Nippon Steel Senior Planner

South Sumatra - West Java (SSWJ) 32" Offshore Gas Pipeline Project - CP2.



- Preparing schedule and pipe loading scenarios to be implemented in relation to daily single joint welding productivity and barge window of availability using P5;



- Preparing transport barges schedule and sequences related to number of available barges and required traffic arrangement during pipelaying activity;



- Preparing pipes coating and thickness identification report;

BP Tangguh LNG Project, Indonesia Senior Planner

-Preparing Level 3 internal schedules of specific tasks (Compressor Repair, Dewatering, Dredging Work) with QA from related departments;



-Developing Skyline Chart tool to be used as high level system readiness monitoring for Team Leaders and Management;



-Verify Contractor’s monthly claim with coordination from related internal departments and prepare investigative report to Management;



-Preparing summary report of Contractor’s costing forecast and spending of specific service work;