Mechanical Engineer, Tianjin Electric Power Construction Company, China Huadian Guangxi Guigang 2*600MW Thermal Power Plant

G
Ganyi WANG 👤 Member for 15 years 2 months
START Date
END Date

Responsibilities:

  • Responsible for the management work of different equipments and tools used on construction site.
  • Compile lifting procedures.
  • Apply the license for lifting equipments from the local government.
  • Manage the related project documents.

Planning Engineer, Tianjin Electric Power Construction Company Nuclear Power Branch, 12/2006 - 11/2008: China Guangdong Nuclear Power Group Ling’ao Nuclear Power Plant phase 2

G
Ganyi WANG 👤 Member for 15 years 2 months
START Date
END Date

Responsibilities:

  • Establish project planning structures about EPS, OBS, RBS, WBS project activity classifying codes etc.
  • Collect necessary information which contains workflow, resource (Budget) plan, activities duration etc.
  • Set up detail construction and commissioning baseline schedule to match contract requirements.
  • Loading and leveling resource.
  • Generate the S Curves and Resource histogram.
  • Use CPM, EVM, S Curve techniques to follow up and analyze the schedule performance.
  • Reschedule and update project schedules b

Lead Planner, Alstom China - Wuhan Boiler Company Ltd., Luneng Xinjiang Hebukesaier Thermal Power Plant 2*300MW Boiler Project,Guo Dian Xi’an Weiyang Thermal Power Plant 2*350MW SC Boiler Project,Morocco SAFI 660MW SC Boiler Island Project,Ganshu Jinchang

G
Ganyi WANG 👤 Member for 15 years 2 months
START Date

Responsibilities:

  • Lead and mentor the Project Planners.
  • Support Tendering department to set up the Tendering Time Schedule.
  • Review schedule information from Engineering, Sourcing and Manufacturing departments.
  • Review the relevant departments’ Resource Plan.
  • Develop and optimize overall Project Master Time Schedule (Baseline) to meet all contract requirements which include milestone dates, payment dates and other requirements.
  • Regularly Monitor.

Asst General Manager (Planning), Shanghai Youhua Process Technology Co.Ltd, saving-energe programming

START Date
END Date

 

Saving-energy Project of some plant of Sinopec is a large project aimed to reduce its energy consumption. Before the new plants was built, the energy consumption was satisfied, but the heat integration between the old and new plants was not so good. So by optimizing the unit plant and improving the connection among different plants, the energy consumption will be reduced.

During the process, I lead a ten-engineer member team, discussed the proposals every week with our team members.

Assistant Project Manager / Project Planner, CSCEC Middle East, Dubai

L
Lu Shengpu 👤 Member for 19 years 2 months
START Date
END Date

CHINA STATE CONSTRUCTION  ENGINEERING CORP (MIDDLE EAST LLC).  DUBAI, UAE  2006-8-29  to 2010-12-30

 

DIVISION: PLANNING DEPARTMENT

 

POSITION:   Deputy Planning Manager                                 &