Reviewing preliminary construction drawings such as, architectural, and structural drawings, and identifying the scope of work by reviewing specifications and attending walkthroughs on work sites.
To estimate and manage civil and engineering projects, primarily in the industrial and commercial infrastructure sector.
Performing accurate quantity takeoffs using Bluebeam software and creating a cost estimation of the projects based on scope of work.
Responsible to analyze client requirements, develop estimates and proposals and lead final negotiations.
Assisted Senior Project Manager in construction or renovation of commercial and educational facilities within Plumbing/Piping/HVAC disciplines. Performed material take-offs, estimated, prepared and submitted the change orders; prepared permit applications and coordinated with AHJ; acted as Company representative at progress and coordination meetings and reviewed, generated and processed submittals & RFIs.
Project Manager and Construction Manager in Residential and Commercial Buildings Industry, Renewable Energy, Oil&Gas and Infrastructure.
Duties covering the full project cycle from scope definition and contractual agreement through to stakeholder, supplier, resource, quality and cost management to ensure handover on time (using Ms Project 2003 and Primavera P5) and within budget.
Raytheon, Chemical Weapons Disposal Incinerator, Umatilla, OR ($1.3 billion) Scheduler for the general contractor constructing a new lethal chemical agent incinerator plant. Prepared cost and resource-loaded time impact analysis schedules for project change orders. Chaired the weekly superintendent schedule review meeting and produced the weekly craft-level “look ahead” work schedule. Updated the monthly cost-loaded billing schedule needed for pay applications.
ACCI, Bellevue, WA As Senior Scheduler prepared schedule delay analysis and exhibits for expert witnesses.
Sound Transit Central Link Light Rail, Beacon Hill Tunnel, Seattle, WA ($310 million) Served as Scheduler on the construction of a twin bore 21’ diameter, one-mile long light rail tunnel, associated trackwork and two transit stations. Reviewed and approved contractor CPM Schedule baseline and update submittals for completeness, accuracy and contract compliance. Prepared critical construction progress trend and status reports, responded to contractor delay claims, prepared Time Impact Analysis and as-built schedules. Prepared cost estimates for change orders.