Project Planner, Italferr S.p.A., Double-track railway line increase
Scope of work:
Double-track line increase between Bologna and Verona (Job: IB01), relevant to the works program for Bologna – Brenner Main Line.
Scope of work:
Double-track line increase between Bologna and Verona (Job: IB01), relevant to the works program for Bologna – Brenner Main Line.
Scope of work:
High speed railway Project Milan-Naples: Urban railway junction of Florence (job: A123). Placing all tracks crossing the city underground, plus the construction of a new underground station for high-speed lines under the existing Central Station area, the construction of a tram system, the commissioning of four new stops, and the connecting up to the new high-speed line Bologna-Rome.
Project Planner on various schemes, tenders and commissionings including:
- North LondonLine Railway Infrastructure Projects (NLRIP)
- Olympics 2012 London Project
- Evergreen GRIP 5 Tender – Chiltern Railways
Project Planner for the Elevators and Escalators Installation in the Major Projects department at Kone Plc.
Project Planner carrying out weekly detailed programme updates EOT claims and Contract programme administration, As Deputy to the Project controls leader I have setup and rolled out a number of controls procedures and monitoring systems across a £770m project.
Including P6 systems administrator, EVA setup and reporting output capture and reporting, Risk analysis using pert master and claims.