Project Controller

Project Controller, KBR Kellogg Brown and Root Pty Ltd, AIR9000 Training Development Project

START Date
END Date
  • Maintain the Earned Value Management System consisting of project master schedule, implemented in Primavera, and cost reporting, using Cobra software.
  • Maintain the Contract Work Breakdown Structure (CWBS).
  • Maintain the CWBS Data Dictionary.
  • Maintain the project Performance Measurement Baseline.
  • Issue and control all baseline change request documents.
  • Produce Master Schedules incorporating WBS and task elements.
  • Participation in integrated baseline reviews with project prime.
  • Review and update the project Earned Val

Project Controller, KBR Kellogg Brown and Root Pty Ltd, AIR5402 MRTT Air to Air Refuelling Project

START Date
END Date
  • Maintain the AIR5402 project schedule, implemented in Open Plan Professional (OPP) software.
  • Maintain the AIR5402 Project Work Breakdown Structure (PWBS).
  • Maintain the Contract Work Breakdown Structure (CWBS).
  • Maintain the project Performance Measurement Baseline (PMB).
  • Guidance and support in the use of scheduling and reporting tools to Project Office Staff.
  • Develop and prepare project performance reports to the Improve Project Scheduling and Status Reporting (IPSSR) Program standard.
  • Analyse the Contractor’s sch

Project Controller, AMEC Transmission & Delivery, London Underground Power Upgrades - Package 2 Tender

E
Eden Day 👤 Member for 15 years 8 months
START Date
END Date

In the role of Project Controller I produced a resource and cost loaded Level 5 tender programme for Package 2 of the London Underground Power Upgrade.

The programme was produced in Primavera P6 and conformed to MPD submission criteria requirements.

I was also asked to represent AMEC regarding the planning of the project to LU at their London headquarters.