Planning Manager

Planning Manager

Contract Employment Saudi Arabia (AS.SA) $14,000 - $15,500/month tax free

Planning Manager, Larsen & Toubro, R1048- Improvements of EXPO 2020 Roads network

START Date
Experience Hours (Planning & Scheduling)
3350
Experience Hours (Forensic Analysis)
500

Planning Manager for Roads, Bridges & Infrastructure projects. Currently engaged on a Major Roads Improvement project for the Expo 2020 event in Dubai, UAE.

Planning Manager, Nuvia, SDP

C
Craig Lea 👤 Member for 7 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4000

Nuvia November 2012 – May 2014 PLANNING MANAGER (Nuclear Design)

• Lead Design Planning Engineer working on the SDP Plant at Sellafield. Joined the ‘team’ to lead the existing ‘area design planners’, introducing standards and QA into the existing operations.

• Appointed Planning Manager after 3 months, due to the quality and self-initiatives that I had already incorporated into the planning function.

Planning Manager, Atkins, Barrow Strategic Redevelopment

C
Craig Lea 👤 Member for 7 years 9 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4500

Atkins May 2014 – May 2016 PLANNING MANAGER (D&E / Major Projects)

• Heading up the Planning and Project Control functions for ‘BSRP’ – Barrow Strategic Redevelopment Programme, £350M Capital Investment.

Planning Manager, IMECO, Abu Dhabi, UAE, Oil & Gas \ Infrastructure \ Irrigation and Landscapes\ Heavy Civil Engineering

R
Rajeev P.U. 👤 Member for 18 years 7 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
1000

Oil & Gas \ Infrastructure \ Irrigation and Landscapes\ Heavy Civil Engineering o Prepared pre and post contract program including tentative\planned curve for progress and cash flow tracking for multi-disciplinary projects o Prepared master program based on concept or available information o Prepare, implement & control resource loaded Clause 14.1 program to meet Contractual milestone or Completion date o Design follow up, review & recommend on contract documents, BOQ & drawings o Comparative study\analysis on priced BoQ of contractor based on similar projects o Highlighted

Planning Manager, ROOTS STEEL INTERNATIONAL, SAUDI ARABIA, King Abdulaziz International Airport(KAIA), Jeddah,

START Date
END Date
Experience Hours (Planning & Scheduling)
1400
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
450

-      Analyze,reviewandcommentonEPCCcontractor’sschedule

-      Analyzeandreviewthecriticalpathandresourcesallocation,utilizingproductionrateandadjacentdurations

-      Identifypotentialrisks,maintainariskregisterandsuggestmitigationplan

-      Developphysicalprogressmeasurementsystem(PPMS)

Planning Manager, Telent UK, RETB Scotland (Radio Electronic Token Block)

START Date
END Date
Experience Hours (Planning & Scheduling)
2350
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
100

Network Rail is in the process of replacing their current RETB radio system for the Far North and West Highland Lines in Scotland. After a life extension of infrastructure systems, the Next Generation RETB project is planning to Design, Manufacture, Test, Commission the replacement of the radio system element (NRN) as the frequencies used are due to be returned to OFCOM at the end of 2015.